TransPhotoMestská Elektrická Hromadná Doprava

Kronika dôležitých udalostí

Prezeranie udalosti: len dôležitých  ·  všetkých

Pridať záznam  ·  Search in Chronology / News

««1 ··· 89909192939495 ··· 210»»

Minsk, 12. mája 2017

The first two BKM-E433 Vitovt-MAX rechargeable electric buses entered service via the trolleybus Line 59.

Astana, 10. mája 2017

A Chinese builder obtained official permit to built LRT in Atstana. According to the company work began on the segment 115-116 of the future line.
Map: https://tengrinews.kz/userdata/downloade...%D1%8C.jpg
Source: http://astana.gov.kz/ru/modules/material/13153

Taiyuan, 5. mája 2017

Троллейбусная линия Шахты Гуанди закрыта. Перевозки больше не осуществляются троллейбусами.
http://www.sohu.com/a/138698075_739601
В статье местной прессы о закрытии движения упоминается, что троллейбусная линия проработала 33 года. До этого момента дата её открытия (1984 г.) была не известна.

Krimski trolejbus, 4. mája 2017

The new trolleybus Line 17 opens between Airport and Khoshkeldy via Evpatoria-Yalta Belt Road, Kievskaya Ulitsa, Kechkemetskaya Ulitsa, Pobedy Prospect, Glinki Ulitsa, Selskaya Ulitsa. There are two segments along the route without an overhead. On the opening day the line was operated with 2 trolleybuses. It is planned to increase service to 10 operating vehicles.

Samara, 4. mája 2017

Construction of the new 2,2 km-long tramway line started between Tashkentskaya Ulitsa and the Samara Arena Stadium as a part of preparations for the FIFA-2018 Soccer Tournament. The line includes the 389 m-long tunnel along Moskovskoe Shosse between Tashkentskaya Ulitsa and the loop, construction of which began last year.

Tallinn, 2. mája 2017

The trolleybus Line 9 is converted into the hybrid bus Line 72.
http://transphoto.ru/articles/5346/

Odense, 2. mája 2017

Stadler Pankow selected to supply 16 Variobahn trams for DKr336m for the light rail line planned for the city. This is 2 more than the city had originally planned to purchase, so that the 7,5 min headway can be operated, rather than the initially proposed 10 min headway. Comsa, together with the local subcontractor Munck Gruppen, will supply overhead installation, substations, track, stops and the maintenance depot for DKr1,2bn. The new 14,7 km-long line with 26 stops will connect Tarup in the north with Hjallelese in the south via Odense Banegård Central and Syddansk Universitet.

Miláno, 1. mája 2017

Suburban tramway "Comasina"-"Limbiate" is split in two pieces "Comasina"-"Cassina Amata" and "Cassina Amata"-"Limbiate".

Florence (Firenze), 1. mája 2017

7 new "Sirio" tram, that will be used on line 3, are already in Florence.

Genoa, 1. mája 2017

Depot, located among "Dinegro" station, enlarged in both directions. There are 4 new rail tracks on west side and 3 new rail tracks on east side. Also a workshop was build on east side.

Moskva, 29. apríla 2017

The trolleybus Lines 13 and 32 are suspended. The diesel bus Lines T13 and T32 are introduced instead. This replacement is yet another step in accordance with Moscow Mayor Sobyanin's plan to close city's trolleybus network.

Strasbourg, 29. apríla 2017

Открытие линии длиной 3.9 км по новому мосту через Рейн и государственную границу в немецкий город Kehl.
Продлен трамвайный маршрут D до конечной станции Kehl Bahnhof.
Планируется дальнейшее продление линии с немецкой стороны.
http://www.lefigaro.fr/flash-eco/2017/04...t-kehl.php

Strasbourg, 29. apríla 2017

Трамвай маршрута D пересек французско-немецкую границу на постоянной основе: состоялось открытие нового участка от Порта-де-Рейн до вокзала г. Кель. До конца июня ветка будет продлена еще на 2 остановки в центр немецкого города.

Krimski trolejbus, 28. apríla 2017

The trolleybus Line 16 opens operating between Maryino & Agrouniversitet.

Miláno, 27. apríla 2017

The tram Line 23 closes. The Line 19 is extended to Lambrate FS in place of the Line 23. The Line 27 is rerouted to Duomo instead of the former terminal Piazza 6 Febbraio. The extended Line 19 now serves the segment between Piazza 6 Febbraio and Duomo in place of the Line 27. The service on the Line 24 is increased by 26 round trips daily. The Lines 15 and 24 exchange terminals — the Line 15 now operates to Via Dogana, while the Line 24 operates to Piazza Fontana.

Sanliurfa, 24. apríla 2017

A tender is being held for construction of a trolleybus line between Balıklıgöl Kavşağı and Eski Otogar (the Bus Station), and delivery of 10 trambuses by the beginning of 2018.

Sofia, 24. apríla 2017

The first 4 tramcars of type Be 4/6 S Schindler/Siemens delivered from Basel. For now, the cars will operate on the Line 8. Pictures from the launch can be found at HERE.

Saransk, 21. apríla 2017

Delivery of the first 30 TrolZa-5275.03 Optima trolleybuses of the batch of vehicles to be delivered in anticipation of the 2018 Soccer Tournament.
http://info-rm.com/2017/04/24/v_saransk_...foto.html/

Bergen, 21. apríla 2017

Opened 2.2 km extension Birkelandsskiftet — Bergen Lufthavn (airport).

Rosario, 19. apríla 2017

Delivery of the first 2 new Russian trolleybuses TrolZa 5265.03 Megapolis for the Line Q out of 12 ordered by the municipality from TrolZa. The trolleybuses were dispatched from the port of Zárate, where they arrived from Russia, on 04.18. As per the Secretary of Mobility, Monica Alvarado, since Trolza delivered trolleybuses with a delay, 2 additional trolleybuses are expected as a penalty for a breach of the contract by TrolZa, in addition to the 12 ordered.

Novorossiysk, 18. apríla 2017

A new Trolza-5265 Megapolis trolleybus was delivered to the depot. It was purchased by the OJSC Chernomortransneft to commemorate its 50th anniversary.

Szeged, 18. apríla 2017

Stadler Rail Valencia S.A.U won the tender of MÁV-START Zrt. for the purchase of 8 + 4 optional diesel-electric tram-train vehicles. The aim of the development implemented from the EU funds is to create a tram-train connection between Szeged and Hódmezővásárhely. MÁV-START is the railway passenger operations subdivision of MÁV Group (Hungarian State Railways), the future operator of the line.

Lviv, 15. apríla 2017

The second segment of the new tram line to Sykhiv neighborhood opens. The Lines 2 and 8 are extended to the loop at Vernadskoho Street.

Samarkand, 15. apríla 2017

The tramway passenger service between Zheleznodorozhniy Vokzal (the Main Railway Station) and Sartepa begins. The line operates between 6:00-23:00 on the 7 minute headway with 8 VarioLF trams. There are 26 stops round-trip.

Volgograd, 15. apríla 2017

The trolleybus Line 18 is suspended. The trolleybus portion of the tram & trolleybus Depot 3 and the trolleybus network served by are closed.

Kramatorsk, 3. apríla 2017

The new trolleybus Line 5 between Zheleznodorozhniy Vokzal (the Main Railroad Station) and EMSS opens.

Lodz, 2. apríla 2017

The route system of the Lodz tramways is radically revamped. Most tram line routings are changed, new lines are introduced, and some terminal names are changed. Passengers are given a free ride for the first 3 days. Changes will affect the Lines 1, 2, 3, 4, 5, 6, 7, 8, 9A, 9B, 10A, 10B, 11A, 11B, 12A, 12B, 13, 14, 15, 16, 17, 41, 43A, 43B, 45, 46.
http://mpk.lodz.pl/rozklady/wholemessage...leId=16131

Los Angeles, Apríl 2017

Metro has signed a contract for the delivery of 64 CRRC HR4000 railcars totaling $178 million. The agreement includes a built-in option that could expand the order to 282 cars for a total of $647 million.
The new trains are intended to serve the D Line extension as well as replace the first generation of aging Breda A650 vehicles. The expected entry into service is 2020.

Catania, 31. marca 2017

The new 3,1 km-long segment of the metro line opens with three new stations — Milo, San Nullo & Nesima. The Cibali station to be located between the San Nullo & Nesima stations will be completed in the future.

Zaporižžia, 31. marca 2017

On March 31, the first of four T-3UA-3 tramcar bodies ordered in March 2017 was delivered to the car maintenance workshops. Details...

««1 ··· 89909192939495 ··· 210»»