![]() |
Chronology Of Main Events / NewsShow: main only · all Add record · Search in Chronology / News Vologda, 12 наурыз 2016 ж.The human rights movement "Vmeste" applied for a permit for a rally against the closure of the trolleybus system in Vologda. The rally is scheduled for 12/03 at one of the city's main squares. The place and the time will be announced later.
The Vologda trolleybus system continues to contract, with daily services being continuously reduced. Gmunden – Vorchdorf – Lambach, 12 наурыз 2016 ж.The last day of operation of the ET23 type cars from 1954 on the Lokalbahn Gmunden — Vorchdorf line. The official presentation of the new Tramlink cars.
Tashkent, 11 наурыз 2016 ж.A dismantling of the Tarakkiyot tramway line has begun. The line was out of service since the dismantling of the TTZ Line via Mirzo Ulugneka Prospect. A project to built a new tramway line from Tarakkiyot Ulitsa to Akhanganskoe Shosse is canceled. The Lines 8, 12, 26 are to be suspended due to rising debts on electricity supply bills by the tramway undertaking.
Bryansk, 5 наурыз 2016 ж.The trolleybus Lines 10 Bezhitskiy Rynok — Yuridicheskiy Fakultet BGU and 10K Bezhitskiy Rynok — Tsentralniy Rynok are suspended. The Line 3 is extended from Tsentraliny Rynok to Gorbatogo Ulitsa. The Line 13K Tsentralniy Rynok — Gorbatogo Ulitsa is renumbered 15. The Line 14C Tsentralniy Rynok — 10-y Mikrorayon is renumbered 5.
http://transphoto.ru/photo/248164/ Qingdao, 5 наурыз 2016 ж.Opening of the first tram line in Qingdao. The 9 km-long line has 12 stops. This is the first tram network in China to operate trams powered with hydrogen.
Los Angeles, 5 наурыз 2016 ж.Линия скоростного трамвая Gold Line продлена от Sierra Madre Villa до APU/Citrus College.
Vologda, 1 наурыз 2016 ж.The trolleybus Line 5 Vokzal — Brigantina is suspended.
Wellington, 1 наурыз 2016 ж.As per information from Wellington trolleybus operator NZ Bus, trolleybus service in the city will be extended by 6 months — until the end of 2017.
Krasnodar, 1 наурыз 2016 ж.The routing for a number of trolleybus lines changes. The Line 2 operating between TRK Krasnaya Ploschad and Zh.D. Vokzal Krasnodar-I is rerouted via Severnaya Ulitsa and Turgeneva Ulitsa. The Line 12 operating from Blagoeva Ulitsa is extended via Mira Ulitsa, Oktyabrskaya Ulitsa, Severnaya Ulitsa and Volodarskogo Ulitsa to Stadion Kuban. The Lines 3 & 5 are suspended. The revenue trolleybus service via Budyonnogo Ulitsa is discontinued.
http://transphoto.ru/photo/892134/ Zhengzhou, Наурыз 2016 ж.Chaohua mine commuting trolleybuses closes, due to the winding up of mining operations at the mine.
Seoul, 29 ақпан 2016 ж.The Incheon Airport Maglev Line opened on February 3, 2016. The line is 6.1 km (3.8 mi) long, with six stations, and operating speed of 110 km/h (68 mph). Two more extensions are planned at 9.7 km and 37.4 km. Once completed, it will become a circular line.
Ostrava, 28 ақпан 2016 ж.The new trolleybus line opens between Náměstí Jurije Gagarina and the Hranečník transit hub. The new segment is served with the Lines 101, 107 & 110.
Dzerzhinsk, 27 ақпан 2016 ж.The citywide rally for tramway preservation.
» Details Washington, DC, 27 ақпан 2016 ж.Opening of the tram line via H Street between Union Station — Benning Road.
Oryol, 27 ақпан 2016 ж.Возобновлено движение троллейбусов по маршруту №8 в Завокзальный посёлок.
Samara, 26 ақпан 2016 ж.The first of the 20 TrolZa-5265 Megapolis trolleybuses acquired 12.2015 delivered to the Depot 1.
Linz, 26 ақпан 2016 ж.Opening of an extension of the tramway Line 3 between Doblerholz — Trauner Kreuzung.
Osh, 25 ақпан 2016 ж.A deal for delivery of 23 Russian-built TrolZa-5275.03 Optima trolleybuses is signed. The delivery is expected within 6 months.
Sterlitamak, 25 ақпан 2016 ж.55th anniversary of Sterlitamak trolleybuses.
Rostov-na-Donu, 24 ақпан 2016 ж.The new prototype 100% low floor Tver-built 71-911E City Star tram for 1435 mm gauge delivered for testing.
Volgograd, 19 ақпан 2016 ж.The segregated trolleybus Line 6 Naberezhnaya — AO Kaustik in the Krasnoarmeyskiy Region of the city is now served with diesel buses.
Bratislava, 16 ақпан 2016 ж.Testing of the new tram line via the newly built Stary Bridge over the Danube River with trams Škoda 30T ForCity Plus 7530 & T6A5 7927+7928.
Moscow, 15 ақпан 2016 ж.Open metro station Salaryevo. The station is located on the Sokolnicheskaya line and became the 200th in the Moscow metro.
Samara, 14 ақпан 2016 ж.Delivery of the first of 20 trams of 71-623-02 type acquired 12.2015 to the Gorodskoe Depot.
Barcelona, 12 ақпан 2016 ж.Открытие юго-восточного участка линии метро L9. 20 км и 15 станций соединят линии метро L1, L3, L5, L8 с терминалами Т1 и Т2 аэропорта El Prat, а также Барселону с городами L´Hospitalet и Prat de Llobregat. Движение поездов будет полностью автоматическим, без машиниста. Все станции сделаны по типу "горизонтальный лифт". Впервые в метро Барселоны будет применён принцип отправления поездов с определённого пути: первого или второго (Via 1, Via 2). Т.е направление будет периодически меняться, в зависимости от пути, отстаивания или даже отставания поезда, смены составов и т.д., поэтому при входе на каждую станцию надо быть внимательным к информационным табло, где будут указаны с какого пути отправляется поезд заданного направления. Стоимость проезда от аэропорта до Zona Universitaria: 4,50€.
Проезд с 12-го по 14-е февраля будет бесплатным для того, чтобы как можно больше жителей и гостей Барселоны ознакомились с линией и станциями. Kazan, 12 ақпан 2016 ж.The lone 71-619KT tram has been decommissioned.
Ústí nad Labem, 9 ақпан 2016 ж.Medellin, 7 ақпан 2016 ж.The official opening ceremony of the Translohr Ayacucho Tram Line took place on 20.10.2015. The introductory passenger service commenced on 26.10.2015. The line operates evenings between 17:00 — 20:00, after daytime construction work is wrapped up. As of 01.2016 up to 370 000 passengers were carried. The revenue service is set to start in March, 2016.
Kazan, 7 ақпан 2016 ж.The first 71-623-02 tram has been delivered to the tram depot.
Montreal, 7 ақпан 2016 ж.Состоялся торжественный запуск нового поезда Bombardier Azur (MPM-10). После почти 10 лет разработки и потраченных $2 млрд. на линию, наконец, вышел первый девятивагонный состав. Всего в этом году ожидается поставка еще 12 поездов, а до конца 2018 года будут заменены все устаревшие вагоны. Новому поезду присвоен номер 10-021 — 10-029: причина в том, что первый состав после испытаний отправился на доработку обратно на завод-изготовитель. Кроме того, для обслуживания новых вагонов существенно модернизированы депо, а также произведено переобучение технического персонала.
Подробная информация о новых вагонах (англ. яз.), Краткий обзор (рус. яз.) |
Бас бет Форум Ережелер Редакциялық алқа Қараңғы тақырып © ТрансФото әкімшілігі және материалдар авторлары, 2002—2025
Сайтта жарияланған фотосуреттер мен өзге де материалдарды пайдалануға олардың авторларының рұқсатымен ғана жол беріледі. |