Elektrická Městská Doprava |
Kronika významných událostíUkázat: pouze významné · vše Přidat zápis · Hledání v kronice Dnipro, 17. listopadu 2016Delivered the first of the 13 new BKM-321 trolleybuses.
Rosario, 10. listopadu 201612 TrolZa Megapolis trolleybuses with auxiliary power option up to 60 km. using lithium-ion batteries will be delivered to Argentina by 03.2017. All electronics will be produced by the Novosibirsk companies ARS-TERM and Irbis.
Rostov-na-Donu, 9. listopadu 2016A vote to convert the Gorkogo Ulitsa tramway line into a segregated right-of-way — see the city's administration site: http://ar.rostov-gorod.ru/initiatives/200
500 votes are needed. Novosibirsk, 9. listopadu 2016Revenue tramway service on the new line to Chistaya Sloboda begins.
Kazaň, 7. listopadu 2016Trams of the 71-608KM (KTM-8KM) type retire.
Gent, 6. listopadu 2016A new segment of the tramway Line 21 opens between Gestichtstraat — Zwijnaarde Bibliotheek.
Irkutsk, 5. listopadu 2016Arrival of the first second-hand 4 trams of types 71-608КМ and 71-617 from Moscow.
Prokopyevsk, 1. listopadu 2016The tram Line 5 BTI — Khlebozavod closes [►]
Novokuznetsk, 1. listopadu 2016The tramway line to Kuybyshevo closes.
Penza, 1. listopadu 2016The new trolleybus line to Mikrorayon Zaprudniy opens. The following routing changes implemented: the Line 4 Zaprudniy — Krivozerye; 6 Zaprudniy — Krivozerye; 7 Zaprudniy — Airport.
Florence, 1. listopadu 201622 new "Sirio" tram, that will be used on line 2, are already in Florence.
Doněck, 31. října 2016Trolleybus overhead for the Line 5 Panfilova Prospect — Pukhova Ulitsa between Tsvetnaya Ulitsa and Kuprina Ulitsa rebuilt.
Vidnoye, 28. října 2016Delivered the new trolleybus MAZ-206T assembled in the city of Ivanovo from a diesel bus.
Záporoží, 27. října 2016On October 26, the first of ten Škoda 14Tr trolleybuses ordered in September 2016 was delivered to the depot # 1. Details...
Blagoveshchensk, 27. října 2016The trolleybus system is closed: Balgoveschensk's mayor Valentina Kalita officially announced system's closure. The last day of trolleybus revenue service was July 8th, 2016.
Samsun, 27. října 2016Delivered the first Durmazlar Panorama tram built in the Turkish city of Bursa of a batch of 8 such trams to be delivered until 03.2017.
Liège, 25. října 2016Planned reintroduction of trams by 2022:
http://www.cs-dopravak.cz/zpravy/2016/10...k-tramvaje Novosibirsk, 22. října 2016Opening of non-revenue test runs via the new tramway line to Mikrorayon Chistaya Sloboda.
Kazaň, 19. října 2016A number of retired 71-608KM (KTM-8M) trams used in service to deal with shortage of trams due to high breakdown rate for LM-99AE trams.
Kazaň, 17. října 2016Trams of the 71-608KM (KTM-8KM) type retire.
Bratislava, 17. října 2016Delivery of the electric bus EBN 11 manufactured by SOR. The electric bus will be tested on Lines 52, 53, 57, 66 & 67 until November 11th. Passengers will get a free ride.
Saratov, 15. října 2016Прибыл первый троллейбус модели БКМ 20101 из Москвы.
Ivano-Frankivsk, 15. října 2016Construction of the new trolleybus line has began. The new line should be built to Regional Clinical Hospital along the Pasichna street and Fedkovicha street.
Bratislava, 12. října 201679 trams are offered for sale: prices begin at €300 for non-operable cars, from €2721 — €4395 for operable cars. Any specific car or a number of cars can be chosen. Each car is sold individually through a web action:
https://imhd.sk/ba/doc/sk/15835/DPB-vyhl...lektriciek Tambov, 11. října 2016A proposed so-called trolleybus route network ‘optimization’ calls for replacement of the most popular Lines 1 and 5 with diesel buses by December, 2016. Trolleybus services via the central segment of Sovetskaya Ulitsa, Entuziastov Boulevard and Moskovskaya Ulitsa will be suspended. The remaining trolleybus lines will carry minimal ridership. It is suspected that city’s authorities are planning to phase out trolleybuses altogether. Please sign
a petition to retain the Tambov trolleybuses. Novokuznetsk, 10. října 2016Are the trams needed on Metallurgov Prospect?
A plan for Metallurgov Prospect reconstruction calls for removal of tramway tracks to make way for additional car lanes. Citizens are invited to express their concerns and vote: http://наш.новокузнецк.рф/poll/42/. A petition on change.org to support trams on Metallurgov Prospect. Kazaň, 10. října 2016Trams of the 71-619 (KTM-19) type retire.
Samsun, 10. října 2016The 10 km-long light rail line extension from Balıkçı to Tekkeköy opens. The second yard storage facility is located at the Tekkeköy Terminal.
Istanbul, 10. října 2016The metro Line M4 extension from Kartal to Tavşantepe is opened.
Samarkand, 5. října 2016Acting president of Uzbekistan Shavkat Mirziyoev proposed construction of a tramway line in Samarkand. The new line should be built between Siabskiy Rynok and the Sartepa apartment block development. Mr. Mirzioyoev also advised to develop a network of future tramway lines with consideration of practical passenger needs. The first segment of the network is to be opened for the Navruz Holiday celebrations on March 21st, 2017. A rapid construction schedule is not unusual for Uzbekistan.
Source: https://www.gazeta.uz/ru/2016/10/05/tram/ |
| Hlavní stránka Fórum Pravidla Redakce Dark mode © Administrace Transphoto a autoři fotografií, 2002—2026
Použití fotografií a jiných materiálů zveřejněných na těchto stránkách je povoleno pouze se souhlasem jejich autorů. |