![]() |
Chronology / news: Paris - Versailles - YvelinesAdd record · Search in Chronology / News June 24, 2024The extension of metro line 14 to Orly airport is open. Seven new stations were opened: Saint-Denis Pleyel, Maison-Blanche, Hôpital Bicêtre, L'Haÿ-les-Roses, Chevilly-Larue, Thiais-Orly, Aéroport d'Orly. The length of the line increased by 14 kilometres to the south and 1.7 kilometres to the north. The total length of the line was 27 kilometres. The Villejuif-G.Roussy station, located on the open section, is scheduled to open to passengers in 2025.
June 13, 2024Opening of the extension of line 11 of the Paris Metro towards Rony-Bois-Perrier. Six stations opened: "Serge Gainsbourg", "Romainville-Carnot", "Montreuil-Opital", "La Duy", "Coteau Beauclair" and "Rony-Bois-Perrier".
May 23, 2024The MP59 cars of the metro are taken officially out of service, after almost 50 years of service.
In reality, some remained in service until at least 12 June 2024. April 5, 2024Inauguration and entry into service of the extension of tram line 3b to Porte Dauphine.
December 9, 2023Tram T12 Massy Évry — Courcouronnes is put in service.
June 24, 2023Tram T10 — La Croix de Berny — Jardin Parisien is put in service. The length is 6,8 km.
July 6, 2022Открыта новая линия трамвая (трам-трейна) T13 Express — Saint-Germain-en-Laye — Saint-Cyr. Длина линии 18,8 км, на линии 12 станций.
April 29, 2022Due to successive fires, probably due to the explosion of the batteries, the entire Bluebus fleet of electric buses has been withdrawn from service until the cause is known.
https://www.youtube.com/watch?v=Q7vnoniqj5U https://www.francetvinfo.fr/economie/tra...24.html March 8, 2022The section of the Transilien line P between Esbly — Crécy-la-Chapelle is operated with Alstom Dualis trams, originating from lines 4 and 11 and replacing the Siemens Avanto trams.
January 13, 2022Открыто продление линии метрополитена М4 на юг, состоящие из двух станций — «Barbara» и «Bagneux — Lucie Aubrac».
April 10, 2021The new tram line T9 — Porte de Choisy — Orly Gaston Viens is put into service. The length of the line is 10.3 km.
December 14, 2020Открыто продление линии метрополитена M14 от станции «Saint-Lazare» до станции «Mairie de Saint-Ouen».
Открыты станции «Pont Cardinet», «Saint-Ouen», «Mairie de Saint-Ouen». Станция «Porte de Clichy» (пересадка на западную ветку 13-й линии) откроется позже. August 31, 2020The eastern branch of T4 tram line has been extended from Arboretum to Hôpital de Montfermeil (0,9 km).
December 14, 2019The new branch Gargan — Arboretum of the T4 tram line is put into service. The length of the new stretch is 4.7 km.
October 12, 2019Линия трамвая T1 продлена на запад от Les Courtilles до Asnières-Quatre Routes. Общая длина линии 17,9 км, на линии 37 остановок.
November 24, 2018The extension of the T3b tram line west of Porte de la Chapelle to Porte d'Asnières is open. The length of the new section with 8 stops is 4.3 km. Thus, the length of the T3b line has been increased to 14.3 km.
July 1, 2017Открыта новая линия трамвая (трам-трейна) T11 Express — Épinay-sur-Seine — Le Bourget. Длина линии 11 км, на линии 7 станций.
May 28, 2016Линия транслора T6 продлена от Robert Wagner до Viroflay-Rive-Droite. Длина нового участка 2,6 км, общая длина линии 14 км.
December 16, 2014The T8 tram line is put into service. The line has two branches: Saint-Denis Porte de Paris — Delaunay–Belleville — Villetaneuse-Université and Saint-Denis–Porte de Paris — Delaunay–Belleville — Épinay-Orgemont. The total length of the line with two branches is 8.5 km, there are 17 stops on the line.
December 13, 2014A new TVR (Translohr) line T6 — Châtillon—Montrouge — Robert Wagner is opened. The length of the line is 12,4 km, there are 19 stations on the line.
The line connects Châtillon Montrouge (underground terminus of the M13 Métro line) and Robert Wagner, the second terminus in the commune of Vélizy-Villacoublay. The line is completely above ground, but an underground section of two stations from Robert Wagner to Viroflay is expected to open in 2016. November 16, 2013The T7 — Villejuif–Louis Aragon — Aéroport d’Orly — Porte de l'Essonne tram line is opened. The length of the line is 11.2 km, there are 18 stops on the line. It takes a tram 30 minutes to reach Porte de l’Essonne.
July 29, 2013Открыта новая линия TVR (транслора) T5 — Marché de Saint-Denis — Garges–Sarcelles. Длина линии 6,6 км.
December 15, 2012Трамвайная линия T3 переименована в T3a и продлена от Porte d’Ivry до Porte de Vincennes. Общая длина линии 12,4 км, на линии 25 остановок.
Открыта новая трамвайная линия T3b — Porte de Vincennes — Porte de la Chapelle. November 19, 2012Линия трамвая T2 продлена от La Défense до Pont de Bezons. Общая длина линии 17,9 км, на линии 24 остановки.
November 15, 2012Линия трамвая T1 продлена на запад от Gare de Saint-Denis до Les Courtilles.
November 21, 2009Линия трамвая T2 продлена от Issy-Val de Seine до Porte de Versailles.
December 16, 2006Открыта новая трамвайная линия T3 — Pont du Garigliano — Porte d’Ivry.
November 18, 2006Открыта новая линия трамвая (трам-трейна) T4 — Bondy — Aulnay-sous-Bois. Длина линии 7,9 км.
December 15, 2003Линия трамвая T1 продлена на восток от Bobigny–Pablo Picasso до Gare de Noisy-le-Sec.
July 2, 1997Открыта новая линия трамвая T2 — La Défense — Issy-Val de Seine.
|
Index Forums Terms & Conditions Editorial Team Dark Theme © TransPhoto administration and authors of photos, 2002—2025
Using any images from this website without authors' permission is prohibited. |