TransPhotoLinnade elektritransport
Rumeenia  
Brăila

Brăila

Toimetaja: Andrei Andraș.

Teavitada veast sellel leheküljel  ·  Muudatused andmebaasis

Kommentaarid: kõik · tramm · troll · elektribuss

Kronoloogia

12.05.2025 Publication of tender for purchase of 40 electric buses (10m) through the South-East Regional Program 2021-2027.
16.11.2024 The modernization works of the tram infrastructure in Monument Park have been completed, at which point trams of lines 21 and 22 are back on the routes.

Due to the still incompletely modernized infrastructure, trams only run between Monument Park and Pod Brăilița (Calea Galați), via Dorobantilor Boulevard (line 22) and Independenței Boulevard (line 21).
14.07.2023 Publication of tender for purchase of minimum 6, maximum 8 trams (18m) through the National Recovery and Resilience Plan.
10.10.2023: contract was signed with Astra Vagoane Călători.
29.05.2023 Tram traffic on the main routes is suspended due to the start of the modernization of the tram infrastructure. The only routes that will continue to be operational are line 24 to Combinat endstation and line 25 to Lacu Sărat village, both with starting point from the Radu Negru Depot.
10.04.2022 Publication of tender for purchase of 2 trams (18m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
31.08.2022: contract was signed with Astra Vagoane Călători.
07.11.2023: all trams were delivered.
Kogu kronoloogia vaatamine

Sõiduki kiirotsing

Number:

Pildiotsing marsruudi alusel

Marsruut:

Trammi ettevõtted



Trolli ettevõtted


Elektribussi ettevõtted



Uued fotod

» Tramm — BR 03, BR 07, BR 08.
» Elektribuss — BR 12 PMB, BR 14 PMB, BR 15 PMB, BR 18 PMB, BR 19 PMB, BR 22 PMB, BR 23 PMB, BR 24 PMB, BR 27 PMB, BR 28 PMB.
» Tramm — 4672, BR 03, BR 04.
Kõik uuendused


Linna aktiivsemad pildistajad

1.koht: KG1990 — 59 foto
2.koht: M. N. — 41 foto
3.koht: Karel Šimána — 31 foto

Pildistajate täisnimekiri

   

Juhuslik foto



Uued fotod