Miscellaneous photos
 |
Florești
The first construction site of the Cluj-Napoca Metro located near the future Teilor station in the village of Florești
31 Aralık 2024 Yıl Yazar: I.L.
|
 |
Florești
The first construction site of the Cluj-Napoca Metro located near the future Teilor station in the village of Florești
31 Aralık 2024 Yıl Yazar: I.L.
|
 |
Florești
The corridor of the westernmost segment of the Cluj-Napoca Metro located between the future Teilor and Țara Moților stations in the village of Florești
31 Aralık 2024 Yıl Yazar: I.L.
|
 |
Dispecerat IRA
На конечной IRA находится довольно таки большая площадка для отстоя ТС.
1 Mart 2014 Yıl Yazar: Santehnik
|
 |
Strada Primăverii
Временная конечная. Судя по всему, работала какое-то время после начала реконструкции. Люди на остановке слева ждут автобус, запущенный по маршруту трамвая
7 Eylül 2011 Yıl Yazar: BubaVV
|
 |
Strada Plopilor
7 Eylül 2011 Yıl Yazar: BubaVV
|
 |
Piața Gării
План реконструкции трамвайной линии. На момент съемки голубой участок разобран полностью, зеленый наполовину. Трамвай заменен автобусом.
7 Eylül 2011 Yıl Yazar: BubaVV
|
 |
Splaiul Independenţei
На заднем плане — стадион Cluj Arena
6 Eylül 2011 Yıl Yazar: BubaVV
|
 |
Strada Ion Popescu Voitești
6 Eylül 2011 Yıl Yazar: BubaVV
|
 |
Splaiul Independenţei
6 Eylül 2011 Yıl Yazar: BubaVV
|
 |
Strada George Barițiu
Трамвай фактически сносят и строят заново
6 Eylül 2011 Yıl Yazar: BubaVV
|
Görüntülenen resim sayısı: 15 / 15
Şu anda tarihe göre sıralanan fotoğraflar (Yeni fotoğraflar ilk sırada listelenir).
|