TransPhotoTransPhotoГородской электротранспорт
Румыния  
Galaţi

Галац

Сообщить о неточности на странице  ·  Изменения в БД

Комментарии: все · трамвай · троллейбус

Хронология

17.12.2018 Tram route 41 (Micro 40 — Poarta Est C.S.G.) is closed due to low profitability.
11.12.2018 Astra Arad won the auction for new trams. The contract provide the delivery of a minimum number of 8 trams and a maximum of 18 trams.
https://www.viata-libera.ro/politica-adm...te-la-arad
04.12.2018 The 15th Skoda 26Tr Solaris arrived. The next two trolleybuses are expected on 12th of December 2018 and January 2019.
https://www.gazetagalatiului.ro/alte-noi...-orasului/
27.11.2018 The second batch of 3 Skoda 26Tr Solaris trolleybuses is expected to arrive in December 2018. In the meantime, the first trolleybus from this batch started the tests in Plzen.
06.09.2018 The tramline section from Baia Comunala to Bazinul Nou is officialy closed.
Просмотр всей хронологии

Быстрый поиск ТС

Номер:

Поиск фото по маршруту

Маршрут:

Троллейбусные предприятия

S.C. Transurb S.A. Список моделей
Нефотографируемый ПС

Карты и схемы

Фотогалереи ГЭТ




Активные фотографы города

1-е место: M. N. — 68 фото
2-е место: Hugo Buss — 22 фото
3-е место: Feronov106 — 14 фото

Полный список фотографов

   

Случайное фото


Новые фотографии