|
|
Električni gradski prijevoz |
Addis Ababa, tramvaj Br. 111
Secondary photos (1): skrij / prikaži
Conditional photos (1): skrij / prikaži
Technical photos (0): skrij / prikaži
 |
Addis Ababa — Tramway Lines and Infrastructure Addis Ababa — Power Outages and Blackouts
Saint Urael Station — Hayahulet 2 Station Route Green
On Tuesday 15 April the power was down systemwide for the entire day.
Trams were scattered around the system at locations where the power cutoff had found them...
• • •
Во вторник 15 апреля "электричество кончилось" по всей сети на весь день.
Трамваи застряли в тех местах линий, где их накрыло отключение...
15 Travanj 2025 god., Utorak Autor: Ymtram
|
¤ |
 |
Addis Ababa — Power Outages and Blackouts
Saint Urael Station — Hayahulet 2 Station Route Green, Service suspended
On Tuesday 15 April the power was down systemwide for the entire day.
Trams were scattered around the system at locations where the power cutoff had found them...
• • •
Во вторник 15 апреля "электричество кончилось" по всей сети на весь день.
Трамваи застряли в тех местах линий, где их накрыло отключение...
15 Travanj 2025 god., Utorak Autor: Ymtram
|
¤ |
Please do not discuss political topics or you will be banned for at least one month!
You need to log in to write comments.
Popisi vozila:
|
|
|