From February 10th to 13th there are a lot of works on the network. New tracks and power lines are installed at several locaties.
So lines 6 and 15 were not operated and on Sunday 11th a temporary line 16 was operated between P+R Melsele and P+R Olympiade. Line 7 run between Eilandje and P+R Olympiade