Transphoto

Photos are published as is and do not have purpose to promote any political and/or ideological position.

All materials are provided by users and do not reflect the opinion of the site administration team.

Close
Kuala Lumpur, Bombardier Innovia Metro 300 # 283; Kuala Lumpur, CSR Zhuzhou AMGLRV # 4291; Kuala Lumpur — Line 3/4 — LRT (Ampang / Sri Petaling Line); Kuala Lumpur — Line 5 — LRT (Kelana Jaya Line)
  Kuala LumpurBombardier Innovia Metro 300 # 283  —  route 5
CSR Zhuzhou AMGLRV # 4291  —  route 4
Line 3/4 — LRT (Ampang / Sri Petaling Line)  ·  Line 5 — LRT (Kelana Jaya Line)
Putra Heights Terminal
The Putra Heights is a combined terminal at the southern end of Line 4 (trainset on the right) and Line 5 (trainset on the left).
Both lines belong to the same Ampang & Sri Petaling Line system, even though different technologies are used — the Line 5 is fully automated.
• • •
Putra Heights — совмещённая конечная по южным концам линии 4 (состав справа) и линии 5 (состав слева).
Обе линии относятся к одной и той же системе Ampang & Sri Petaling Line, но используют разные технологии — линия 5 полностью автоматизирована.

Author: Ymtram · East Haven - Branford           Date: Wednesday, April 19, 2023

Show shooting location on the map

Statistics

Published 05.06.2023 19:52 MSK
Views — 169

Detailed info

Voting

Rating: +3

Kuala Lumpur, Bombardier Innovia Metro 300 # 283

Operator/Facility:Kelana Jaya Line
Model:Bombardier Innovia Metro 300
Current state:In operation
Purpose:Passenger vehicle

Kuala Lumpur, CSR Zhuzhou AMGLRV # 4291

Operator/Facility:Ampang & Sri Petaling Line
Model:CSR Zhuzhou AMGLRV
Current state:In operation
Purpose:Passenger vehicle

Camera Settings

Model:iPhone SE (2nd generation)
Date and Time:19.04.2023 12:08
Exposure Time:1/100 sec
Aperture Value:1.8
ISO Speed:40
Focal Length:3.99 mm
Show all EXIF tags

Your comment

Please do not discuss political topics or you will be banned for at least one month!
You need to log in to write comments.