Transphoto

Photos are published as is and do not have purpose to promote any political and/or ideological position.

All materials are provided by users and do not reflect the opinion of the site administration team.

Close
Kuala Lumpur, CSR Zhuzhou AMGLRV # 4436; Kuala Lumpur, Bombardier Innovia Metro 300 # 172; Kuala Lumpur — Line 3/4 — LRT (Ampang / Sri Petaling Line); Kuala Lumpur — Line 5 — LRT (Kelana Jaya Line)
  Kuala LumpurCSR Zhuzhou AMGLRV # 4436  —  route 4, 4431+4432+4433+4434+4435+4436
Bombardier Innovia Metro 300 # 172  —  route 5
Line 3/4 — LRT (Ampang / Sri Petaling Line)  ·  Line 5 — LRT (Kelana Jaya Line)
Putra Heights Terminal
The westward view from the Putra Heights Terminal station.
The Putra Heights is a combined terminal at the southern end of Line 4 (on the left, changing ends) and Line 5 (on the right, leaving the station).
Both lines belong to the same Ampang & Sri Petaling Line system, even though different technologies are used — the Line 5 is fully automated.
• • •
Вид от конечной станции Putra Heights на запад.
Putra Heights — совмещённая конечная по южным концам линии 4 (слева, оборот поезда) и линии 5 (справа, поезд отходит от станции).
Обе линии относятся к одной и той же системе Ampang & Sri Petaling Line, но используют разные технологии — линия 5 полностью автоматизирована.

Author: Ymtram · East Haven - Branford           Date: Wednesday, April 19, 2023

Show shooting location on the map

Statistics

Published 04.06.2023 17:02 MSK
Views — 196

Detailed info

Kuala Lumpur, CSR Zhuzhou AMGLRV # 4436

Operator/Facility:Ampang & Sri Petaling Line
Model:CSR Zhuzhou AMGLRV
Current state:In operation
Purpose:Passenger vehicle

Kuala Lumpur, Bombardier Innovia Metro 300 # 172

Operator/Facility:Kelana Jaya Line
Model:Bombardier Innovia Metro 300
Current state:In operation
Purpose:Passenger vehicle

Your comment

Please do not discuss political topics or you will be banned for at least one month!
You need to log in to write comments.