TransPhotoMiejski Transport Elektryczny

Kronika wydarzeń ogólnych

Pokaż: tylko ogólne  ·  wszystkie

Dodaj zapis  ·  Znajdź w kronice

««1 ··· 88899091929394 ··· 210»»

Changchun, 30 czerwca 2017 r.

Открыта линия классического подземного метрополитена (Линия №1) протяжённостью 18 км с 14 станциями.

Lipieck, 28 czerwca 2017 r.

Closure of the trolleybus system is postponed until fall of 2017. http://most.tv/news/83852.html http://gorod48.ru/news/445620/

Coimbra, 28 czerwca 2017 r.

Trolleybuses do not operate since January 2017. The overhead is partially dismantled due to construction works. The overhead reconstruction and acquisition of new trolleybuses are planned using EU funds.

Witebsk, 23 czerwca 2017 r.

The new trolleybus line via Voinov-Internatsionalistov Ulitsa opens. The new Line 11 opens operating between Mikrorayon Medtsentr — Vokzal via Petrusya Brovki Ulitsa, Voinov-Internatsionalistov Ulitsa, Chernyakhovskogo Prospect, Lenina Ulitsa, Kirova Ulitsa.

Moskwa, 23 czerwca 2017 r.

The trolleybus yard on Novoryazanskaya Ulitsa (the former Depot 2) ceased operations spelling closure of one of the oldest trolleybus facilities in the city.

Krasnodar, 20 czerwca 2017 r.

Two trolleybuses rebuilt from Trolza-5250 Ecobus buses delivered to the Depot 1.

Chodżent, 19 czerwca 2017 r.

Россия и Таджикистан подписали меморандум о сотрудничестве по воссозданию в Худжанде троллейбусной линии: https://tj.sputniknews.ru/20170619/khudz...67.html.

Moskwa, 17 czerwca 2017 r.

The trolleybus Lines M7 & M7K (formerly 63) close. Diesel buses will be operated instead. Thus only two trolleybus lines now remain in the city center within Sadovoe Koltso — the lines via Bolshaya Polyanka Ulitsa and Bolshaya Yakimanka Ulitsa.

Izmit, 17 czerwca 2017 r.

The tramway operation in the city begins. The new 7,4 km-long line between Sekapark in the west and Otogar (the Bus Station) in the east with 11 stations opens. The depot is located near the Otogar Terminal. Travel time via the entire line is 24 min. The line is operated with 12 Durmazlar Panorama trams built in the city of Bursa.

Kazań, 15 czerwca 2017 r.

A heritage tour tram of the RVZ-6M2 type starts operation via the Line 2 following 8 years after removal of this type of trams from service. The general tour ticket price is set at 209 rubles, 100 rubles for students, 300 rubles with food included, the ride is free for senior citizens and children younger than 7 y.o. The tram will operated Thursday-Sunday between 10:00-22:00 hours.

13 czerwca 2017 r.

Изменения в принципах модерации фотографий.
Сроки аналогичности снижены и разделены на два:
-2 недели для всех авторов
-2 месяца между фотографиями конкретного автора.
Сроки аналогичности являются строгими, публикация по И- К+ отменена.
-Дневные и ночные фото не являются взаимно равноценными.
-Добавлено исключение из правила о равноценности для городов, откуда не было фото в интервале ± 1 год от даты съёмки.

Обсуждение на форуме.

Wellington, 13 czerwca 2017 r.

The "new" date for the trolleybus system closure is set for October 31st, 2017. The overhead dismantling is set for November, 2017.

Zhuhai, 13 czerwca 2017 r.

Открыто движение по трамвайной линии протяжённостью 8,9 км (12 станций). Линия имеет колею 1435 мм, традиционно питание осуществляется от третьего рельса (без использования воздушной контактной сети).

Sarańsk, 12 czerwca 2017 r.

The official presentation of the new 30 TrolZa-5275.03 Optima trolleybus. The head of the Republic of Mordovia V. D. Volkov accepted a new rolling stock and took a ride on one of the new trolleybus.

Moskwa, 10 czerwca 2017 r.

The trolleybus Line M8 (formerly the Line 45) closes. The diesel bus Line M8 will be operated instead.

Werona, 9 czerwca 2017 r.

Opening of the funicular via the 1941-1944 route between Borgo Trento — Castel San Pietro.

Sankt Petersburg, 9 czerwca 2017 r.

Operation of two-car EMU trams LVS-86K ceases for an unknown period of time (possibly permanently). The second cars of former consists will be mothballed.

Antracyt, 7 czerwca 2017 r.

A single trolleybus operated by the KP Antratsitovskoe Trolleybusnoe Upravlenie UZhKH resumed service vie the Line 2 Zavod AZST — 4-y Mirkorayon. The fare is 8 rubles.

Moskwa, 5 czerwca 2017 r.

The trolleybus Line 88 closes. The diesel bus Line T88 will be operated instead.

Sewastopol, 4 czerwca 2017 r.

Delivered the first two trolleybuses of the TrolZa-5265.02 Megapolis type.

Wołgograd, 1 czerwca 2017 r.

The Trolleybus Depot subdivision facility (formerly known as the Depot 1) is closed. The Lines 10, 15 & 15a are now serviced by the main Depot facility (formerly the Depot 4). The headways on the Lines 10 & 15 are increased up to 20-30 minutes, while evening service after 1600-1700 hours practically ceased.

Ałmaty, 1 czerwca 2017 r.

Work began on tram track dismantling.

Rzym, 1 czerwca 2017 r.

Fiat Ansaldo MR500: withdrawn from the passenger service.

Samarkanda, 23 maja 2017 r.

Construction of the second tram line between Zh.D. Vokzal (the Main Railway Station) and Siabskiy Rynok (the Siabskiy Market) via Rudaki Ulitsa.
http://transphoto.ru/photo/1023847/
Trams received new fleet numbers 1001-1013. The rest of the vehicles are not renumbered as of yet.

Norymberga, 22 maja 2017 r.

The U3 extension opens between Friedrich-Ebert-Platz and Nordwestring.

Czeboksary, 15 maja 2017 r.

The new trolleybus Line 22 opens between Universitet and Entuziastov Ulitsa;
The Line 7 that previously operated between Universitetskaya Ulitsa and Agregatniy Zavod is suspended, the trolleybuses are reassigned to the Line 22;
The Line 9 operating from the Airport is extended to Krasnaya Ploschad via Lenin Prospect without a detour via Gagarina.
The Line 21 operating between Universitet and Meditsinskiy Tsentr is rerouted via Michman Pavlov Ulitsa and Moskovskiy Prospect.

Wołgograd, 15 maja 2017 r.

Trolleybus Lines 1, 8 & 8A are suspended. The Line 9 is extended from ZKO to Kuybysheva Ploschad. Selected runs via the Line 12 are rerouted to Zheleznodorozhniy Vokzal (the Main Railroad Station). The number of vehicles operating the Lines 9 & 12 is increased at the expense of the former Lines 1, 8 & 8A.

Łódź, 14 maja 2017 r.

The suburban tram Line 41 is replaced with diesel buses between Łódź Chocianowice Ikea — Pabianice due to poor condition of the infrastructure. The city of Pabianice announced a tender for an emergency work on the overhead.

Detroit, 12 maja 2017 r.

Grand Opening of the QLINE streetcar service.

Rosario, 12 maja 2017 r.

All 12 TrolZa 5265.03 Megapolis trolleybuses have been delivered. The new vehicles are undergoing night trials in operation both under the overhead and in auxiliary power mode. It has been reported that upon a sample 25 km. run with air conditioning and all lights on, the batteries were discharged 40% of the nominal total. It is assumed that the units will be numbered 21-32 in correlation with the TrolZa factory numbers 88-99.

««1 ··· 88899091929394 ··· 210»»