TransphotoTransports Électriques de Ville

Chronologie des événements principaux

Montrer: principal seulement  ·  tous

Ajouter un enregistrement  ·  Rechercher dans la chronologie

««1 ··· 949596979899100 ··· 211»»

Ivano-Frankivsk, 15 octobre 2016

Construction of the new trolleybus line has began. The new line should be built to Regional Clinical Hospital along the Pasichna street and Fedkovicha street.

Bratislava, 12 octobre 2016

79 trams are offered for sale: prices begin at €300 for non-operable cars, from €2721 — €4395 for operable cars. Any specific car or a number of cars can be chosen. Each car is sold individually through a web action:
https://imhd.sk/ba/doc/sk/15835/DPB-vyhl...lektriciek

Tambov, 11 octobre 2016

A proposed so-called trolleybus route network ‘optimization’ calls for replacement of the most popular Lines 1 and 5 with diesel buses by December, 2016. Trolleybus services via the central segment of Sovetskaya Ulitsa, Entuziastov Boulevard and Moskovskaya Ulitsa will be suspended. The remaining trolleybus lines will carry minimal ridership. It is suspected that city’s authorities are planning to phase out trolleybuses altogether. Please sign
a petition to retain the Tambov trolleybuses.

Novokouznetsk, 10 octobre 2016

Are the trams needed on Metallurgov Prospect?
A plan for Metallurgov Prospect reconstruction calls for removal of tramway tracks to make way for additional car lanes. Citizens are invited to express their concerns and vote:
http://наш.новокузнецк.рф/poll/42/.

A petition on change.org to support trams on Metallurgov Prospect.

Kazan, 10 octobre 2016

Trams of the 71-619 (KTM-19) type retire.

Samsun, 10 octobre 2016

The 10 km-long light rail line extension from Balıkçı to Tekkeköy opens. The second yard storage facility is located at the Tekkeköy Terminal.

Istamboul, 10 octobre 2016

The metro Line M4 extension from Kartal to Tavşantepe is opened.

Samarcande, 5 octobre 2016

Acting president of Uzbekistan Shavkat Mirziyoev proposed construction of a tramway line in Samarkand. The new line should be built between Siabskiy Rynok and the Sartepa apartment block development. Mr. Mirzioyoev also advised to develop a network of future tramway lines with consideration of practical passenger needs. The first segment of the network is to be opened for the Navruz Holiday celebrations on March 21st, 2017. A rapid construction schedule is not unusual for Uzbekistan.
Source: https://www.gazeta.uz/ru/2016/10/05/tram/

La Nouvelle-Orléans, 2 octobre 2016

The Loyola-UPT streetcar line extension opens along North Rampart Street between Canal Street & Rampart and Elysian Fields Avenue. The line's designation is changed to the Loyola-Rampart Line.

Kostroma, 1 octobre 2016

The trolleybus services 4 between Fabrika Znamya Truda — Zavod Rabochiy Metallist, and 5 between Posyolok Oktyabrskiy — Zavod Rabochiy Metallist are suspedned. The trolleybus line to Zavod Rabochiy Metallist loses revenue service.
http://transphoto.ru/photo/611108/

Engels, 1 octobre 2016

The trolleybus Line 12 is 'temporarily' suspended. The Line 14 in the city-bound direction only is rerouted via Khimikov Prospect, Kosmonavtov Ulitsa and Lomonosova Ulitsa. A new overhead switch is installed at Khimikov Prospect and Kosmonavtov Ulitsa for the new move. A segment via Khimikov Prospect from Kosmonavtov Ulitsa to the Khimkombinat Terminal loses revenue service and is cut off from the rest of the network.
http://transphoto.ru/photo/405412/

Samarcande, octobre 2016

Construction of the new tramway line has began.
16.10.2016 delivered the first batch of VarioLF trams from Tashkent: 2001, 2002, 2003, 2004.
17.10.2016 delivered the second batch of VarioLF trams: 2005, 2006, 2007, 2009.

Canton, 28 septembre 2016

Начато строительство кольцевой линии метрополитена (№11) протяжённостью 43,2 км (32 станции).

Séoul, 24 septembre 2016

Gyeonggang Line between Pangyo and Yeoju opens for service

Tachkent, 22 septembre 2016

As per an announcement by the Tashkent's Khokimiyat (city administration) press office, the acting President of Uzbekistan Shavkat Mirziyoev ordered a resurrection of construction of the Yunusabad Metro Line, and completion of the two metro stations in the nearest future. In addition planning will be accelerated for the construction of the overground metro line to the Sergeli neighborhood.

Kourgan, 22 septembre 2016

Trolleybus overhead is completely dismantled.

Kryvyï Rih, 19 septembre 2016

Dismantling of a trolleybus overhead between Rokovataya and Prudy via Simbirtseva Ulitsa and Konstitutsionnaya Ulitsa, the former Line 17.

Riga, 17 septembre 2016

A tender for 20 low floor trams to be used on the Line 4 Tsentralniy Rynok — Imanta is competed.

Moscou, 16 septembre 2016

Three new metro stations open on the Line 10: Butyrskaya, Fonvizenskaya and Petrovsko-Razumvovskaya. At the Petrovsko-Razumovskaya Station an over-the-platform transfer is available for the Line 9.

Novossibirsk, 14 septembre 2016

Delivered the second batch of second hand trams from Moscow, former Moscow fleet numbers —
1240, 4201, 4243, 5255, 5259.

Pleven, 12 septembre 2016

Four trolleybus lines closed 3, 4, 11, 97. Four new trolleybus lines open instead 31, 33, 91, 44.
http://trolei.pleven.bg/?page_id=27

Kazan, 11 septembre 2016

Dismantling of a trolleybus wire in one direction of travel via Said-Galeeva, Rustema Yakhina, Gayaza Iskhaki and Chernyshevskogo Ulitsa, from Tashayak Ulitsa to Moskovskaya Ulitsa.

Cincinnati, 9 septembre 2016

The Cincinnati Bell Connector tramway service opens.

9 septembre 2016


Zlatooust, 1 septembre 2016

Трамвайный маршрут № 3 вновь сокращён и вместо площади Металлургов следует только до к/ст «ПО им. Бушуева».

Krementchouk, 30 août 2016

The new Bogdan T70117 trolleybus number 210 enters revenue service.

Moscou, 29 août 2016

Открыт второй зал станции Петровско-Разумовская, на который начали прибывать поезда Серпуховско-Тимирязевской линии, следующие в направлении станции Алтуфьево. Выход в город временно, до завершения строительных работ, осуществляется только через первый зал станции. В ближайшее время здесь будет организована кросс-платформенная пересадка с Люблинско-Дмитровской линией.

Ternopil, 28 août 2016

A new one-way trolleybus line opens on Lesya Kurbas Ulitsa and Tekstilnaya Ulitsa, utilized by the Line №3 oparating between Vinnichenko Ulitsa — TRTs "Podolyany" (with a stopover at the central market between 10 to 16 hours). Details at — https://www.youtube.com/watch?v=8ZzRcIdK1BM

Krasnodar, 28 août 2016

Последний краснодарский троллейбус-«гармошка» ЗиУ-683В01 № 212, списанный в 2012 году, выкуплен энтузиастами-транспортниками и отбуксирован на новую площадку. В планах новых владельцев машины — восстановление оригинального внешнего вида и интерьера троллейбуса, переоборудование раритета в клуб-музей любителей пассажирского транспорта.

Astrakhan, 27 août 2016

A petition to re-instate tram service in Astrakhan:
https://www.change.org/p/%D0%B0%D0%BB%D0...ef=Default

««1 ··· 949596979899100 ··· 211»»