TransphotoElektrischer Nahverkehr

Globale Nachrichten

Anzeigen: nur globale  ·  alle

Eintrag hinzufügen  ·  Suche nach Nachrichten

««1 ··· 88899091929394 ··· 210»»

Changchun, 30. Juni 2017

Открыта линия классического подземного метрополитена (Линия №1) протяжённостью 18 км с 14 станциями.

Lipezk, 28. Juni 2017

Closure of the trolleybus system is postponed until fall of 2017. http://most.tv/news/83852.html http://gorod48.ru/news/445620/

Coimbra, 28. Juni 2017

Trolleybuses do not operate since January 2017. The overhead is partially dismantled due to construction works. The overhead reconstruction and acquisition of new trolleybuses are planned using EU funds.

Wizebsk, 23. Juni 2017

The new trolleybus line via Voinov-Internatsionalistov Ulitsa opens. The new Line 11 opens operating between Mikrorayon Medtsentr — Vokzal via Petrusya Brovki Ulitsa, Voinov-Internatsionalistov Ulitsa, Chernyakhovskogo Prospect, Lenina Ulitsa, Kirova Ulitsa.

Moskau, 23. Juni 2017

The trolleybus yard on Novoryazanskaya Ulitsa (the former Depot 2) ceased operations spelling closure of one of the oldest trolleybus facilities in the city.

Krasnodar, 20. Juni 2017

Two trolleybuses rebuilt from Trolza-5250 Ecobus buses delivered to the Depot 1.

Khudzhand, 19. Juni 2017

Россия и Таджикистан подписали меморандум о сотрудничестве по воссозданию в Худжанде троллейбусной линии: https://tj.sputniknews.ru/20170619/khudz...67.html.

Moskau, 17. Juni 2017

The trolleybus Lines M7 & M7K (formerly 63) close. Diesel buses will be operated instead. Thus only two trolleybus lines now remain in the city center within Sadovoe Koltso — the lines via Bolshaya Polyanka Ulitsa and Bolshaya Yakimanka Ulitsa.

Izmit, 17. Juni 2017

The tramway operation in the city begins. The new 7,4 km-long line between Sekapark in the west and Otogar (the Bus Station) in the east with 11 stations opens. The depot is located near the Otogar Terminal. Travel time via the entire line is 24 min. The line is operated with 12 Durmazlar Panorama trams built in the city of Bursa.

Kasan, 15. Juni 2017

A heritage tour tram of the RVZ-6M2 type starts operation via the Line 2 following 8 years after removal of this type of trams from service. The general tour ticket price is set at 209 rubles, 100 rubles for students, 300 rubles with food included, the ride is free for senior citizens and children younger than 7 y.o. The tram will operated Thursday-Sunday between 10:00-22:00 hours.

13. Juni 2017

Изменения в принципах модерации фотографий.
Сроки аналогичности снижены и разделены на два:
-2 недели для всех авторов
-2 месяца между фотографиями конкретного автора.
Сроки аналогичности являются строгими, публикация по И- К+ отменена.
-Дневные и ночные фото не являются взаимно равноценными.
-Добавлено исключение из правила о равноценности для городов, откуда не было фото в интервале ± 1 год от даты съёмки.

Обсуждение на форуме.

Wellington, 13. Juni 2017

The "new" date for the trolleybus system closure is set for October 31st, 2017. The overhead dismantling is set for November, 2017.

Zhuhai, 13. Juni 2017

Открыто движение по трамвайной линии протяжённостью 8,9 км (12 станций). Линия имеет колею 1435 мм, традиционно питание осуществляется от третьего рельса (без использования воздушной контактной сети).

Saransk, 12. Juni 2017

The official presentation of the new 30 TrolZa-5275.03 Optima trolleybus. The head of the Republic of Mordovia V. D. Volkov accepted a new rolling stock and took a ride on one of the new trolleybus.

Moskau, 10. Juni 2017

The trolleybus Line M8 (formerly the Line 45) closes. The diesel bus Line M8 will be operated instead.

Verona, 9. Juni 2017

Opening of the funicular via the 1941-1944 route between Borgo Trento — Castel San Pietro.

Sankt Petersburg, 9. Juni 2017

Operation of two-car EMU trams LVS-86K ceases for an unknown period of time (possibly permanently). The second cars of former consists will be mothballed.

Antrazyt, 7. Juni 2017

A single trolleybus operated by the KP Antratsitovskoe Trolleybusnoe Upravlenie UZhKH resumed service vie the Line 2 Zavod AZST — 4-y Mirkorayon. The fare is 8 rubles.

Moskau, 5. Juni 2017

The trolleybus Line 88 closes. The diesel bus Line T88 will be operated instead.

Sewastopol, 4. Juni 2017

Delivered the first two trolleybuses of the TrolZa-5265.02 Megapolis type.

Wolgograd, 1. Juni 2017

The Trolleybus Depot subdivision facility (formerly known as the Depot 1) is closed. The Lines 10, 15 & 15a are now serviced by the main Depot facility (formerly the Depot 4). The headways on the Lines 10 & 15 are increased up to 20-30 minutes, while evening service after 1600-1700 hours practically ceased.

Almaty, 1. Juni 2017

Work began on tram track dismantling.

Rom, 1. Juni 2017

Fiat Ansaldo MR500: withdrawn from the passenger service.

Samarkand, 23. Mai 2017

Construction of the second tram line between Zh.D. Vokzal (the Main Railway Station) and Siabskiy Rynok (the Siabskiy Market) via Rudaki Ulitsa.
http://transphoto.ru/photo/1023847/
Trams received new fleet numbers 1001-1013. The rest of the vehicles are not renumbered as of yet.

Nürnberg, 22. Mai 2017

The U3 extension opens between Friedrich-Ebert-Platz and Nordwestring.

Tscheboksary, 15. Mai 2017

The new trolleybus Line 22 opens between Universitet and Entuziastov Ulitsa;
The Line 7 that previously operated between Universitetskaya Ulitsa and Agregatniy Zavod is suspended, the trolleybuses are reassigned to the Line 22;
The Line 9 operating from the Airport is extended to Krasnaya Ploschad via Lenin Prospect without a detour via Gagarina.
The Line 21 operating between Universitet and Meditsinskiy Tsentr is rerouted via Michman Pavlov Ulitsa and Moskovskiy Prospect.

Wolgograd, 15. Mai 2017

Trolleybus Lines 1, 8 & 8A are suspended. The Line 9 is extended from ZKO to Kuybysheva Ploschad. Selected runs via the Line 12 are rerouted to Zheleznodorozhniy Vokzal (the Main Railroad Station). The number of vehicles operating the Lines 9 & 12 is increased at the expense of the former Lines 1, 8 & 8A.

Łódź, 14. Mai 2017

The suburban tram Line 41 is replaced with diesel buses between Łódź Chocianowice Ikea — Pabianice due to poor condition of the infrastructure. The city of Pabianice announced a tender for an emergency work on the overhead.

Detroit, 12. Mai 2017

Grand Opening of the QLINE streetcar service.

Rosario, 12. Mai 2017

All 12 TrolZa 5265.03 Megapolis trolleybuses have been delivered. The new vehicles are undergoing night trials in operation both under the overhead and in auxiliary power mode. It has been reported that upon a sample 25 km. run with air conditioning and all lights on, the batteries were discharged 40% of the nominal total. It is assumed that the units will be numbered 21-32 in correlation with the TrolZa factory numbers 88-99.

««1 ··· 88899091929394 ··· 210»»