![]() |
重要新闻展示: 仅重要新闻 · 所有 Florence (Firenze), 1 十一月 2016 年22 new "Sirio" tram, that will be used on line 2, are already in Florence.
頓涅茨克, 31 十月 2016 年Trolleybus overhead for the Line 5 Panfilova Prospect — Pukhova Ulitsa between Tsvetnaya Ulitsa and Kuprina Ulitsa rebuilt.
維德諾耶, 28 十月 2016 年Delivered the new trolleybus MAZ-206T assembled in the city of Ivanovo from a diesel bus.
紮波羅熱, 27 十月 2016 年On October 26, the first of ten Škoda 14Tr trolleybuses ordered in September 2016 was delivered to the depot # 1. Details...
海蘭泡, 27 十月 2016 年The trolleybus system is closed: Balgoveschensk's mayor Valentina Kalita officially announced system's closure. The last day of trolleybus revenue service was July 8th, 2016.
薩姆松, 27 十月 2016 年Delivered the first Durmazlar Panorama tram built in the Turkish city of Bursa of a batch of 8 such trams to be delivered until 03.2017.
列日, 25 十月 2016 年Planned reintroduction of trams by 2022:
http://www.cs-dopravak.cz/zpravy/2016/10...k-tramvaje 新西伯利亚, 22 十月 2016 年Opening of non-revenue test runs via the new tramway line to Mikrorayon Chistaya Sloboda.
喀山, 19 十月 2016 年A number of retired 71-608KM (KTM-8M) trams used in service to deal with shortage of trams due to high breakdown rate for LM-99AE trams.
喀山, 17 十月 2016 年Trams of the 71-608KM (KTM-8KM) type retire.
布拉迪斯拉发, 17 十月 2016 年Delivery of the electric bus EBN 11 manufactured by SOR. The electric bus will be tested on Lines 52, 53, 57, 66 & 67 until November 11th. Passengers will get a free ride.
薩拉托夫, 15 十月 2016 年Прибыл первый троллейбус модели БКМ 20101 из Москвы.
伊瓦諾-福蘭基夫斯克, 15 十月 2016 年Construction of the new trolleybus line has began. The new line should be built to Regional Clinical Hospital along the Pasichna street and Fedkovicha street.
布拉迪斯拉发, 12 十月 2016 年79 trams are offered for sale: prices begin at €300 for non-operable cars, from €2721 — €4395 for operable cars. Any specific car or a number of cars can be chosen. Each car is sold individually through a web action:
https://imhd.sk/ba/doc/sk/15835/DPB-vyhl...lektriciek 坦波夫, 11 十月 2016 年A proposed so-called trolleybus route network ‘optimization’ calls for replacement of the most popular Lines 1 and 5 with diesel buses by December, 2016. Trolleybus services via the central segment of Sovetskaya Ulitsa, Entuziastov Boulevard and Moskovskaya Ulitsa will be suspended. The remaining trolleybus lines will carry minimal ridership. It is suspected that city’s authorities are planning to phase out trolleybuses altogether. Please sign
a petition to retain the Tambov trolleybuses. 新庫斯內次, 10 十月 2016 年Are the trams needed on Metallurgov Prospect?
A plan for Metallurgov Prospect reconstruction calls for removal of tramway tracks to make way for additional car lanes. Citizens are invited to express their concerns and vote: http://наш.новокузнецк.рф/poll/42/. A petition on change.org to support trams on Metallurgov Prospect. 喀山, 10 十月 2016 年Trams of the 71-619 (KTM-19) type retire.
薩姆松, 10 十月 2016 年The 10 km-long light rail line extension from Balıkçı to Tekkeköy opens. The second yard storage facility is located at the Tekkeköy Terminal.
伊斯坦布尔, 10 十月 2016 年The metro Line M4 extension from Kartal to Tavşantepe is opened.
撒馬爾罕, 5 十月 2016 年Acting president of Uzbekistan Shavkat Mirziyoev proposed construction of a tramway line in Samarkand. The new line should be built between Siabskiy Rynok and the Sartepa apartment block development. Mr. Mirzioyoev also advised to develop a network of future tramway lines with consideration of practical passenger needs. The first segment of the network is to be opened for the Navruz Holiday celebrations on March 21st, 2017. A rapid construction schedule is not unusual for Uzbekistan.
Source: https://www.gazeta.uz/ru/2016/10/05/tram/ 新奧爾良, 2 十月 2016 年The Loyola-UPT streetcar line extension opens along North Rampart Street between Canal Street & Rampart and Elysian Fields Avenue. The line's designation is changed to the Loyola-Rampart Line.
科斯特羅馬, 1 十月 2016 年The trolleybus services 4 between Fabrika Znamya Truda — Zavod Rabochiy Metallist, and 5 between Posyolok Oktyabrskiy — Zavod Rabochiy Metallist are suspedned. The trolleybus line to Zavod Rabochiy Metallist loses revenue service.
http://transphoto.ru/photo/611108/ 恩格斯城, 1 十月 2016 年The trolleybus Line 12 is 'temporarily' suspended. The Line 14 in the city-bound direction only is rerouted via Khimikov Prospect, Kosmonavtov Ulitsa and Lomonosova Ulitsa. A new overhead switch is installed at Khimikov Prospect and Kosmonavtov Ulitsa for the new move. A segment via Khimikov Prospect from Kosmonavtov Ulitsa to the Khimkombinat Terminal loses revenue service and is cut off from the rest of the network.
http://transphoto.ru/photo/405412/ 撒馬爾罕, 十月 2016 年Construction of the new tramway line has began.
16.10.2016 delivered the first batch of VarioLF trams from Tashkent: 2001, 2002, 2003, 2004. 17.10.2016 delivered the second batch of VarioLF trams: 2005, 2006, 2007, 2009. 广州, 28 九月 2016 年Начато строительство кольцевой линии метрополитена (№11) протяжённостью 43,2 км (32 станции).
首尔, 24 九月 2016 年Gyeonggang Line between Pangyo and Yeoju opens for service
塔什干, 22 九月 2016 年As per an announcement by the Tashkent's Khokimiyat (city administration) press office, the acting President of Uzbekistan Shavkat Mirziyoev ordered a resurrection of construction of the Yunusabad Metro Line, and completion of the two metro stations in the nearest future. In addition planning will be accelerated for the construction of the overground metro line to the Sergeli neighborhood.
庫爾干, 22 九月 2016 年Trolleybus overhead is completely dismantled.
克里維里赫, 19 九月 2016 年Dismantling of a trolleybus overhead between Rokovataya and Prudy via Simbirtseva Ulitsa and Konstitutsionnaya Ulitsa, the former Line 17.
里加, 17 九月 2016 年A tender for 20 low floor trams to be used on the Line 4 Tsentralniy Rynok — Imanta is competed.
|
主页 论坛 用户条约 编辑团队 深色主题 © Transphoto 管理员和图片作者, 2002—2025
不允许未经过作者允许使用网站上的图片。. |