![]() |
Kronoloogia: MölltalLisa sissekanne · Otsing kronoloogias 2016 a.Closure of the Reißeckbahn funicular.
26 september 1997 a.Opening of the Mölltal Glacier Express, which runs through a tunnel and is the longest funicular railway in the world with 4.827 metres.
15 september 1963 a.Opening of the Pasterzenbahn funicular between the Pasterze glacier and the Kaiser-Franz-Josefs-Höhe (212 metres length).
1955 a.Opening of the Kreuzeckbahn funicular.
|
Avalehele Foorum Reeglid Toimetuse kolleegium Tume teema © Transphoto administratsioon ja materjalide autorid, 2002—2025
Sellel saidil ilmunud fotode ja muude materjalide kasutamine on lubatud ainult nende autorite loaga. |