TransPhotoPilsētas elektrotransports

Hronoloģija: Ahmedabad

Atpakaļ uz pilsētas lapu

Pievienot ierakstu  ·  Hronoloģijas meklēšana

18 maija 2019 g.

Amraiwadi station is open.

4 marta 2019 g.

Line 1 traffic opened.
Vastral Gam — Apparel Park (6.5 km; except Amraiwadi, Vastral and Rabari Colony stations).

Februāris 2019 g.

The trial runs were carried out in February 2019.

17 janvāri 2016 g.

Construction of Line 2 has begun.

14 marta 2015 g.

Construction of the Gujarat Metro has begun.