TransPhotoTransportul electric urban

Cronologie / Știri: Tianshui

Întoarce-te la pagina orașului

Adaugă o înregistrare  ·  Caută în Cronologie / Știri

29 iulie 2025 an

Tianshui Tram (via Tianshui Urban Construction Investment Company) wins the bid for 12 AnsaldoBreda/CRRC Sirio trams and associated spare parts that were left unused after the Zhuhai Light Rail ceased operations. Total cost of this purchase was approximately just $2.41 million USD.

18 iunie 2025 an

Tianshui Tram Stage 2 commences operation, extending line 1 on the west (Jingkunxijunsanzhong—Wulipu) end and creating a branch line from Yangpo Dong to Tianshui Airport.

1 mai 2020 an

Opening of phase 1 of the tram network from Wulipu to railway station. Length — 12.9 km.

Noiembrie 1961 an

Trolleybus operation in Tianshui comes to an end. The trolleybus system had an unreliable power supply, compounded by the use of steel overhead wires, as opposed to copper. As the trolleybuses were still relatively new at the time, two trolleybuses and various electrical equipment were exchanged with four buses from Lanzhou.

1 octombrie 1959 an

The trolleybus system in Tianshui is extended on both ends, now running from Dongshilipu to Tianshuijun. Two new Shanghai trolleybuses are procured for the extended route.

10 iulie 1958 an

Tianshui trolleybus system commences operation on an east-west oriented 5.36㎞ trolleybus line, operated by a single retrofitted trolleybus produced by Tianshui Automobile Repair Factory. Tianshui becomes the fifth Chinese city to operate a trolleybus.