![]() |
Kronika: ŘímPřidat zápis · Hledání v kronice 8. srpna 2025The second of the 36 new Hitachi trains has been delivered on this day.
26. května 2025For new works:
Line 2: bus service for track works Line 5: tram service Line 8: tram serivce Line 14: tram service Line 19: tram service between Centocelle and Valle Giulia — bus service between Valle Giulia and Piazza Del Risorgimento. 7. dubna 2025The first of new 36 Hitachi trains for the metro has been delivered.
7. března 2025The first electric bus in Rome from ATAC went into service, it belongs to the Portonaccio depot and is an Iveco E-Way 12m. It is a series of 110 buses, but more can still be ordered.
3. března 2025To allow for urgent track replacement work on Via dei Castani, between Via delle Acacie and Via degli Ulivi, from Monday 3 March and until no longer necessary, the tram service will be suspended and the following replacement services will be activated:
Single service with tram called 514 between Termini station/Palmiro Togliatti section. Limitation of line 19 on the “largo Preneste-Valle Giulia” section called 19L. Bus service (Piazza dei Gerani/largo Preneste) called 519 Tram line 19 Line 19, departing from Valle Giulia, will limit their runs to Largo Preneste, where the return runs will begin. Tram lines 5 and 14 A single tram service called 514 will be activated from Viale Palmiro Togliatti to Termini station (and vice versa) on the normal route of line 14. 10. února 2025Tram lines 5, 14 and 19 are reactivated. Line 19 temporary terminus in Valle Giulia.
2. prosince 2024The tram in back in service on line 2, 3 and 8.
5. srpna 2024For track work:
Line 2: tram Line 3: bus service Line 8: bus service Line 14: tram Line 19: bus service From 5th until 25 August. 26. února 2024For track work:
Line 2: bus service Line 3: bus service Porta Maggiore -> Valle Giulia. Tram service Porta Maggiore -> Trastevere Line 19: bus service Porta Maggiore -> Risorgimento 8. prosince 2023Ending of night work on the Ottaviano — Anagnina section of line A. The old operating mode of the line is restored:
from 5:30 a.m. to 11:30 p.m. Sunday through Thursday and from 5:30 a.m. to 1:30 a.m. Friday and Saturday. 30. října 2023The sections between via Bresadola and Viale Palmiro Togliatti are closed for tram tracks renovation work.
As a result, tram line 14 will be redirected to Piazza Gerani. The closed section is being replaced by buses. 1. října 2023Line 8: the tram service is restored.
23. června 2023Start of work on the site of the future Venezia metro station on line C.
4. července 2022For heavy track work:
Line 3 replaced by buses between Porta Maggiore and Trastevere; Line 8 replaced by buses. 4. července 2022Start of night work on the entire section of the first stage of line A (Ottaviano — Anagnina) to replace the old railway track and strengthen the underground sections of the line.
From Sunday to Thursday from 21:00 the line is completely replaced by buses along its entire length (Battistini — Anagnina). From Friday to Saturday the line operates normally until 01:30. 29. července 2020From July 31 to August 4, tram number 3 will be interrupted and will be replaced by buses due to renovations in Piazza Porta Maggiore.
20. července 2020Between August 8 and 23, the section between EUR Magliana and Laurentina stations on metro line B will be closed due to repair work to restore the track ramp near EUR Fermi station.
10. července 2020С 13 июля по 7 декабря с 20:30 линия С будет закрыта для работ по завершению участка San Giovanni — Fori Imperiali.
6. července 2020С 6 по 24 Июля, начинаются работы на Viale delle Milizie. 19-я линия трамвая будет полностью заменена автобусом-челноком на всей протяженности линии.
23. června 2020From 17:50 Baldo degli Ubaldi station on line A will be closed due to a temporary lack of staff.
8. června 2020Подтверждено выделение финансов (213 млн. евро) для линии Roma-Giardinetti (Centocelle):
возвращение в эксплуатацию участок Centocelle-Giardinetti, модернизацию всей линии и её продление от станции Giardinetti до району Tor Vergata. 29. února 2020From March 2 to August 6 at 21:00 the section of Castro Pretorio — Laurentina line B will be closed for repairs.
14. srpna 2019Closing of line A section between San Giovanni-Ottaviano stations for repair work.
4. srpna 2019The section of line A between Termini-Anagnina stations is closed for repair work.
8. července 2019The opening of a new trolleybus line 74 in the Laurentino area between Laurentina (MB) and Via Brunetti.
26. června 2019Возвращена в эксплуатацию станция "Repubblica" линии А. (На итальянском: https://www.google.com/amp/s/amp-video.r...121/338724)
13. května 2019The electric bus Line 119 is back in service. The electric minibus service in the historic city center was suspended in 2015 due to lack of money and poor condition of the car batteries.
7. května 2019Была возвращена в эксплуатацию станция "Spagna" линии А. (Ссылка на итальянском: https://www.ilmessaggero.it/roma/news/me...75929.html).
23. března 2019Station "Spagna" closed due to breakage escalator
(https://www.google.com/amp/s/roma.repubb...34401/amp/) 21. března 2019The station "Barberini" is closed due to the breakdown of the escalator (https://www.quotidiano.net/cronaca/metro...4501681).
|
Hlavní stránka Fórum Pravidla Redakce Dark mode © Administrace Transphoto a autoři fotografií, 2002—2025
Použití fotografií a jiných materiálů zveřejněných na těchto stránkách je povoleno pouze se souhlasem jejich autorů. |