![]() |
历史/新闻纪录: 蒙特雷27 两月 2021 年The Monterrey Metro Line 3 is 7.5 kilometres long, of which only 800 metres of track run underground. The remaining distance (6.7 km) is covered by trains on an elevated overpass.
The expected passenger capacity of the new line is 300,000 people per day. See also: https://www.urban-transport-magazine.com...o-line/ |
主页 论坛 用户条约 编辑团队 深色主题 © Transphoto 管理员和图片作者, 2002—2025
不允许未经过作者允许使用网站上的图片。. |