![]() |
历史/新闻纪录: 格拉納達21 九月 2017 年The Tranvía Metropolitano de Granada Light Rail Line opens for passenger service. The 15,9 km-long line between Albolote in the north and Armill in the south of the city has 26 stops, 3 of which are underground stations within the 3 km-long tunnel under the city center. The line is operated with 15 CAF Urbos 3 trams, which received numbers 301-315. The line operates between 6:00 in the morning (Sundays from 7:30) and 23:00 at night (Fridays, Saturdays until 2:00).
|
主页 论坛 用户条约 编辑团队 深色主题 © Transphoto 管理员和图片作者, 2002—2025
不允许未经过作者允许使用网站上的图片。. |