TransPhotoPilsētas elektrotransports

Hronoloģija: Toyama

Atpakaļ uz pilsētas lapu

Pievienot ierakstu  ·  Hronoloģijas meklēšana

21 marta 2020 g.

A long-awaited tramway tunnel connector under the Main Railway Station has been opened connecting the Centram (central city tram lines) and the Portram (port light rail line) and thus allowing for through service. The Lines 4, 5 and 6 have been introduced.