![]() |
Kronoloogia: ToyamaLisa sissekanne · Otsing kronoloogias 21 märts 2020 a.A long-awaited tramway tunnel connector under the Main Railway Station has been opened connecting the Centram (central city tram lines) and the Portram (port light rail line) and thus allowing for through service. The Lines 4, 5 and 6 have been introduced.
|
Avalehele Foorum Reeglid Toimetuse kolleegium Tume teema © Transphoto administratsioon ja materjalide autorid, 2002—2025
Sellel saidil ilmunud fotode ja muude materjalide kasutamine on lubatud ainult nende autorite loaga. |