![]() |
Kronika: LuoyangPridať záznam · Search in Chronology / News 15. februára 2025Luoyang trolleybus route 102 stops running from February 15.
November 2023Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.
Jún 2023Trolleybus contact network east of Qilihe for route 103 is dismantled.
26. decembra 2021Metro line 2 opens between Erqiao Road and Balitang stations.
September 1984Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.
Jún 1983Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).
|
Titulná strana Fórum Podmienky používania Redakcia Dark Theme © Administrácia TransPhoto a autori materiálov, 2002—2025
Použitie fotografií a iných materiálov zverejnených na týchto stránkach je povolené len so súhlasom ich autorov. |