TransPhotoҚалалық электр көлігі

Chronology / news: Luoyang

Return to the city page

Add record  ·  Search in Chronology / News

15 ақпан 2025 ж.

Luoyang trolleybus route 102 stops running from February 15.

Қараша 2023 ж.

Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.

Маусым 2023 ж.

Trolleybus contact network east of Qilihe for route 103 is dismantled.

26 желтоқсан 2021 ж.

Metro line 2 opens between Erqiao Road and Balitang stations.

Қыркүйек 1984 ж.

Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.

Маусым 1983 ж.

Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).