![]() |
Minden hír: LuoyangHír hozzáadása · Keresés a hírekben 15 február 2025 .Luoyang trolleybus route 102 stops running from February 15.
november 2023 .Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.
június 2023 .Trolleybus contact network east of Qilihe for route 103 is dismantled.
26 december 2021 .Metro line 2 opens between Erqiao Road and Balitang stations.
szeptember 1984 .Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.
június 1983 .Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).
|
Kezdőlap Fórumok Felhasználási feltételek Szerkesztők Sötét nézet © TransPhoto szerkesztők és fotósok, 2002—2025
A honlapon szereplő képek felhasználása a szerzők hozzájárulása nélkül tilos!. |