![]() |
Kronologija / vijesti: LuoyangAdd record · Search in Chronology / News 15 Veljača 2025 god.Luoyang trolleybus route 102 stops running from February 15.
Studeni 2023 god.Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.
Lipanj 2023 god.Trolleybus contact network east of Qilihe for route 103 is dismantled.
26 Prosinac 2021 god.Metro line 2 opens between Erqiao Road and Balitang stations.
Rujan 1984 god.Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.
Lipanj 1983 god.Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).
|
Početna Forumi Uvjeti i odredbe Urednička skupina Tamna tema © TransPhoto administration and authors of photos, 2002—2025
Zabranjena je uporaba slika s ove stranice bez dopuštenja autora. |