15 février 2025

Luoyang trolleybus route 102 stops running from February 15.

novembre 2023

Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.

juin 2023

Trolleybus contact network east of Qilihe for route 103 is dismantled.

26 décembre 2021

La ligne 2 du métro ouvre entre les stations Erqiao Road et Balitang.

septembre 1984

Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.

juin 1983

Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).