![]() |
Alle Nachrichten: LuoyangEintrag hinzufügen · Suche nach Nachrichten 15. Februar 2025Luoyang trolleybus route 102 stops running from February 15.
November 2023Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.
Juni 2023Trolleybus contact network east of Qilihe for route 103 is dismantled.
26. Dezember 2021Metro line 2 opens between Erqiao Road and Balitang stations.
September 1984Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.
Juni 1983Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).
|
Startseite Forum Nutzungsbedingungen Redaktion Dunkelmodus © Administration von TransPhoto und FotoautorInnen, 2002—2025
Jegliche Nutzung der Fotos dieser Webseite ist ohne Zustimmung der AutorInnen nicht gestattet. |