![]() |
Chronology / news: GalaţiAdd record · Search in Chronology / News 1 тамыз 2023 ж.Tramway Route 39 has been extended from COMAT to Depou Bariera Traian.
11 маусым 2023 ж.Publication of tender for purchase of 20 electric buses (12m) through the National Recovery and Resilience Plan.
18.01.2024: contract was signed with Solaris Bus & Coach. 21 мамыр 2023 ж.Publication of tender for purchase of 22 electric buses (9m) through the National Recovery and Resilience Plan.
14.12.2023: contract was signed with Solaris Bus & Coach. 17 мамыр 2023 ж.Publication of tender for purchase of 10 trams (18m) through the National Recovery and Resilience Plan.
15.01.2024: contract was signed with Astra Vagoane Călători. 9 қаңтар 2023 ж.Route 44 (Piața Centrală — COMAT) has been reopened. Route 39 has been extended from Micro 40 to COMAT.
4 шiлде 2022 ж.Trolleybus route 104 (Tiglina 3 — Centru) has been closed due to the low passenger loads, the overlap with other routes and the easy alternatives for transfers with other means of transport. Before the closure, there were 2 trolleybuses operating on route 104 with an average load of 14% of carrying capacity on the segment unique to this line.
1 сәуір 2022 ж.Route 39 has been partially reactivated after finishing the reconstruction of the network between Micro 19 and Piața General Berthlot (Micro 40)
22 наурыз 2022 ж.Testing of the section between Piața Energiei and Piața General Berthlot.
Route 39 is set to become active again from 1st of April between Micro 19 and Piața General Berthlot. The complete route will become active when the roadworks on Bulevardul George Coșbuc will be done. 1 наурыз 2020 ж.The entire tramway network is temporarily closed for 18 months due to a major reconstruction of the network on Strada Siderurgistilor and Bulevardul 1 Decembrie 1918. All trams are replaced with buses.
17 желтоқсан 2018 ж.Tram route 41 (Micro 40 — Poarta Est C.S.G.) is closed due to low profitability.
6 қыркүйек 2018 ж.The tramline section from Baia Comunala to Bazinul Nou has been closed.
25 мамыр 2018 ж.Publication of tender for purchase of minimum 8, maximum 18 trams (18m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
19.03.2020: 8 trams contract was signed with Astra Vagoane Călători. 14.12.2021: all 8 trams were delivered. 21 наурыз 2017 ж.A contract was signed with Škoda Electric for the supply of 14 new Škoda 26Tr Solaris trolleybuses. http://www.skoda.cz/skoda-electric-uspela-v-rumunsku/
26 тамыз 2012 ж.New trams. 12 Duewag ZGT-6 for Galati from Rotterdam.
|
Бас бет Форум Ережелер Редакциялық алқа Қараңғы тақырып © ТрансФото әкімшілігі және материалдар авторлары, 2002—2025
Сайтта жарияланған фотосуреттер мен өзге де материалдарды пайдалануға олардың авторларының рұқсатымен ғана жол беріледі. |