TransPhotoLinnade elektritransport

Kronoloogia: České Budějovice

Tagasi linna lehele

Lisa sissekanne  ·  Otsing kronoloogias

1 mai 2025 a.

Current bus line 15 is converted to trolleybus operation. The line is 9 km long, of which 2 km between stops Výstaviště and Poliklinika Jih lack overhead wires and will be covered in battery mode. 14 of the 35 new Škoda 33Tr SOR trolleybuses equipped with traction batteries have been delivered to date. This brings an end to the regular operation of Škoda 15Tr in České Budějovice and all of Czechia. Farewell trips are planned on 2 May when trolleybuses 27, 48 and 50 will operate the whole day on lines 2, 3 and 9.

30 august 2018 a.

Příchod prvního nového trolejbusu Škoda 27Tr Solaris s karoserie IV generace (ev. č. 401) • Arrival of the first new trolleybus Škoda 27Tr Solaris with body IV generation (No. 401).

2 mai 1991 a.

Otevírací třetího trolejbusového provozu v Českých Budějovicích • Opening of the third trolleybus operation in České Budějovice.

24 september 1971 a.

Uzavření druhého trolejbusového provozu v Českých Budějovicích • Closure of the second trolleybus operation in České Budějovice.

28 oktoober 1948 a.

Otevírací druhého trolejbusového provozu v Českých Budějovicích • Opening of the second trolleybus operation in České Budějovice.

1 august 1914 a.

Uzavření prvního trolejbusového provozu v Českých Budějovicích (tramvaj bez kolejnic) • Closure of the first trolleybus operation in České Budějovice (rail without track).

27 oktoober 1909 a.

Otevírací prvního trolejbusového provozu v Českých Budějovicích (tramvaj bez kolejnic) • Opening of the first trolleybus operation in České Budějovice (rail without track).