![]() |
Kronika: IstanbulPridať záznam · Search in Chronology / News 15. januára 2021From January 15, by the decision of the Turkish Ministry of Health, as part of the measures against COVID-19, HES code is necessarily for using public transport in Istanbul. This decision is aimed at making public transport safer during the pandemic.
According to a circular issued by the Ministry of the Interior as part of the measures taken by the Ministry of Health, information about people who have been diagnosed with the virus or who have come into contact with infected people and who use public city transport during isolation is transmitted to the relevant authorities. The use of public transport by persons with confirmed COVID-19, or who have been in contact with these people, will be temporarily prohibited. The HES code must be linked to the transport map of the city of Istanbulkart. Passengers who did not link the code to the card before this date will not be able to use public transport until they link them. To link the transport card to the HES code, you must enter the passport number, HES code and other information requested on the page: https://kisisellestirme.istanbulkart.istanbul/. When citizens identified as a "risk group" in the HES app attach their cards to the validator at the turnstile, a warning message will appear on the turnstile screen. Along with these warnings, passengers at risk will be prohibited from using public transport. 8. januára 2021From 21:00 on January 8 to 05:00 on January 11, a curfew, that will be applied across Istanbul was declared. For this reason, the following metro, tram and funicular lines will not operate on these days:
M6 (Levent — Boğaziçi Üniversitesi-Hisarüstü) T2 (Taksim — Tünel) T3 (Kadıköy — Moda) F1 (Taksim — Kabataş) Passengers will be able to use İETT buses which run along the route of these lines and stop near closed stations. From 06:00 on January 11, these lines will resume their work according to the previously published weekday schedule (T2 line — from 07:00). The remaining metro and tram lines (M1, M2, M3, M4, M5, M7, T1 and T4) will operate from 06:00 to 0:00 at 15-minute intervals. The T5 line (Cibali — Alibeyköy Cep Otogarı) will operate from 06:00 to 20:40 at 20-minute intervals. The F3 line (Seyrantepe — Vadistanbul) will operate from 07:20 to 22:00 at 10-minute intervals. From 06:00 on January 11, these lines will resume their work according to the previously published weekday schedule (F3 line — from 07:20). The operating hours and intervals of the F2 line (Karaköy — Beyoğlu) operated by İETT can be viewed at: https://tunel.iett.istanbul/tr/tunel/pag...eri/544. Marmaray system will work on a regular schedule. Also, due to the curfew, exits at some stations will be closed. Information about closed exits can be found on the page: https://www.metro.istanbul/en/SeferDurumlari/Ariza/6. 1. januára 2021The municipality of Kadıköy will carry out sidewalk improvement and renovation, drainage and environmental improvement works to prevent cars from parking on the tracks of the T3 tram line (Kadıköy — Moda). The line will be closed to passengers from January 1 to January 24, 2021, to ensure smooth and fast end of works.
1. januára 2021On January 1, 2021, the first section from Cibali station to Alibeyköy Cep Otogarı station of the T5 tram line (Eminönü — Alibeyköy) was opened. Due to the curfew in Istanbul, the trams will start to run with passengers at 06:00 on January 4. The first 10 days (until January 14) rides will be free of charge.
The line is 8.8 km long and has 12 stations. The one-way trip takes 30 minutes. The traffic interval is 6 minutes at peak time. In order to avoid visual pollution, electrification is not from traditional overhead wires, but from power lines embedded in the ground between the tracks. At the first time, the T5 line will be maintained by 10 5-section Turkish Durmazlar Panorama trams, and by September 2021 – by 30 cars. After 2023, according to the passenger amount, the number of trams will increase to 50. To maintain them, Alibeyköy tram depot was built next to the northern terminus of the line. 31. decembra 2020From 21:00 on December 31, 2020 to 05:00 on January 4, 2021, a curfew, that will be applied across Istanbul was declared. For this reason, the following metro, tram and funicular lines will not operate on these days:
M6 (Levent — Boğaziçi Üniversitesi-Hisarüstü) T2 (Taksim — Tünel) T3 (Kadıköy — Moda) F1 (Taksim — Kabataş) Passengers will be able to use İETT buses which run along the route of these lines and stop near closed stations. From 06:00 on January 4, these lines will resume their work according to the previously published weekday schedule (T2 line — from 07:00). The remaining metro and tram lines (M1, M2, M3, M4, M5, M7, T1 and T4) will operate from 06:00 to 0:00 at 15-minute intervals. The F3 line (Seyrantepe — Vadistanbul) will operate from 07:20 to 22:00 at 10-minute intervals. From 06:00 on January 4, these lines will resume their work according to the previously published weekday schedule (F3 line — from 07:20). The operating hours and intervals of the F2 line (Karaköy — Beyoğlu) operated by İETT can be viewed at: https://tunel.iett.istanbul/tr/tunel/pag...eri/544. Marmaray system will work on a regular schedule. Also, due to the curfew, exits at some stations will be closed. Information about closed exits can be found on the page: https://www.metro.istanbul/en/SeferDurumlari/Ariza/6. 25. decembra 2020From 21:00 on December 25, 2020 to January 15, 2021, on the T4 line (Topkapı — Mescid-i Selam), due to maintenance and repair work, trams will run only one track between Şehitlik and Fetihkapı stations.
From December 25 to January 6, trams will run only Mescid-i Selam-bound track at Edirnekapı, Vatan and Fetihkapı stations, and from January 7 to January 15 at the same stations only on Topkapı-bound track. Passengers will use one platform to go in both directions. From 21:00 on December 25 to January 6, 2/3 of trams, going from Mescid-i Selam station will terminate at Şehitlik station. A third of trams will reach the Topkapı terminal station. Passengers will be notified if the tram terminates at Şehitlik station. On weekdays from 06:00 to 21:00, trams will run between Mescid-i Selam and Şehitlik stations according to the usual weekday schedule, and between Şehitlik and Topkapı the intervals will be 15 minutes. On weekdays in the evening after 21:00 and on weekends, the intervals on the entire line will be 15 minutes. From January 7 until the end of works, all trams running from Mescid-i Selam station will terminate at Şehitlik station. Shuttle service will be organized between Şehitlik and Topkapı stations. Passengers traveling to Topkapı station and passengers traveling towards Mescid-i Selam station will need to transfer at Şehitlik station. The shuttle interval will be 15 minutes. 1. decembra 2020On weekdays from 21:00 to 05:00 a curfew, that will be applied across Istanbul was declared. For medical workers and other citizens who have to work during the restriction, most of metro, tram and funicular lines will continue their work from 21:00 to 0:00 at 15-minute intervals. The F2 line (Karaköy — Beyoğlu) will not operate during the restriction (the last route at 20:45). The T2 line (Taksim — Tünel) will operate from 21:00 to 22:00 at 50-minute intervals. The F3 line (Seyrantepe — Vadistanbul) will operate from 21:00 to 22:00 at 20-minute intervals. Marmaray system will work on a regular schedule.
Daytime work schedule isn't changed. 28. októbra 2020On 28 October 2020, the Meciyeköy — Mahmutbey section of the M7 metro line (Kabataş — Esenyurt) was opened. Trains started to run with passangers at 12 o'clock.
15 new stations were opened. The line is 18 km long. The total travel time will be 32 minutes between the end stations. The first 10 days ride will be free of charge. The line connects six districts of Istanbul, where 3 million people live. Time intervals are 6 or 7,5 minutes. The fleet consists of 20 4-car Hyundai Rotem driveless trains. The trains are served in the new Tekstilkent depot. 11. septembra 2020On the 11th of September due to M9 line integration and M1 line capacity enhancement works Yenibosna, World Trade Centre (DTM) and Atatürk Airport stations will be temporarily closed. Services on M1A will be provided between Yenikapı and Ataköy-Şirinevler.
From Ataköy-Şirinevler station to Atatürk Havalimanı (Atatürk Airport) will run İETT shuttles free of charge with stops near closed stations. When the M9 line (İkitelli Sanayi — Ataköy) integration works are completed, comfortable and fast transfer will be provided between the lines. Line M9 is planned to be partially opened in 2021. Opening date of these stations isn't reported. https://www.metro.istanbul/en/announceme...1a-line 23. júla 2020According to the decision, made by Istanbul mayor, from 8:00 p. m. July, 23 trams on T1 line (Kabataş — Bağcılar) will only operate between Kabataş — Eminönü and Bağcılar — Beyazıt stations.
The decision was made due to the fact that the streets near the stations of Beyazıt — Eminönü part of T1 line will be completely closed for traffic because of the opening of Hagia Sophia Grand Mosque. T1 line will start to operate as usual at 6:00 a. m. of July, 27. 6. júla 2020T3 nostalgic tram line, which was closed during the coronavirus pandemic, begins to operate with passengers on the 6th of July.
During the time when the line was closed, old tracks were replaced with new ones. The wagons were repaired for the first time since April 2013. The livery of the wagons was changed, too. Now you can see titles İstanbul Senin (Istanbul is yours) on it. 12. marca 201912 марта 2019 года состоялось торжественное открытие системы Мармарай на участках Kazlıçeşme — Halkalı и Ayrılık Çeşmesi — Gebze (запуск для пассажиров состоялся 13 марта). Таким образом, система Мармарай функционирует на всех своих участках (кроме ответвления на вокзал Haydarpaşa).
Была проведена реконструкция путей и запущен третий путь для высокоскоростных поездов. Также были реконструированы все станции, подвижной состав был полностью заменён на современный. Участок Kazlıçeşme — вокзал Sirkeci не используется для пассажирской эксплуатации. Реконструкция вокзала Haydarpaşa на азиатской части города продолжается, её завершение планируется в 2021 году. 21. októbra 2018Открыта вторая очередь линии метро Стамбула М5 от станции Yamanevler до станции Çekmeköy в азиатской части города. Первая очередь открыта 15.12.2017.
10. októbra 2016The metro Line M4 extension from Kartal to Tavşantepe is opened.
1. decembra 2015Произошел взрыв самодельного взрывного устройства рядом со станцией линии М1 Bayrampaşa-Maltepe. Есть пострадавшие. По данным СМИ, в составе метрополитена от взрыва оказались выбиты стекла. Через несколько часов метрополитен Стамбула продолжил работу.
19. apríla 2015Открыта линия метро M6 Levent — Boğaziçi Üniversitesi, состоящая из 4 станций: Levent (пересадка на линию M2), Nispetiye, Etiler и Boğaziçi Üniversitesi.
29. októbra 2013К 90-летию основания Турецкой Республики открыт подводный железнодорожный тоннель Мармарай протяжённостью 13,6 км под проливом Босфор, между европейской и азиатской частями Стамбула. По тоннелю запущена линия городской электрички, соединившая ранее существовавшие маршруты В1 и В2. Новая линия длиной 76 км. между Halkalı и Gebze станет основной линией общественного транспорта Стамбула. Полная реконструкция и открытие всей линии планируется к июню 2015 г. Новая линия исключает использование вокзалов Sirkeci и Haydarpaşa в европейской и азиатской частях города соответственно.
3. februára 2011Линии трамвая T1 (Kabataş — Zeytinburnu) и T2 (Bağcılar — Zeytinburnu) объединяются в одну целую линию T1 (Kabataş — Bağcılar).
Вместе с этим, на линию выходят первые 14 новых вагонов Alstom Citadis 304, которые должны заменить высокопольный ПС на бывшей линии T2. Оставшиеся 23 трамвая будут запущены в ближайшие недели. Полная замена высокопольного ПС планируется в течение года. Линия ностальгического трамвая T5 (Taksim — Tünel) перенумеровывается в линию T2. |
Titulná strana Fórum Podmienky používania Redakcia Dark Theme © Administrácia TransPhoto a autori materiálov, 2002—2025
Použitie fotografií a iných materiálov zverejnených na týchto stránkach je povolené len so súhlasom ich autorov. |