8 აგვისტო 2025 წელი

The second of the 36 new Hitachi trains has been delivered on this day.

26 მაისი 2025 წელი

For new works:
Line 2: bus service for track works
Line 5: tram service
Line 8: tram serivce
Line 14: tram service
Line 19: tram service between Centocelle and Valle Giulia — bus service between Valle Giulia and Piazza Del Risorgimento.

7 აპრილი 2025 წელი

The first of new 36 Hitachi trains for the metro has been delivered.

7 მარტი 2025 წელი

The first electric bus in Rome from ATAC went into service, it belongs to the Portonaccio depot and is an Iveco E-Way 12m. It is a series of 110 buses, but more can still be ordered.

3 მარტი 2025 წელი

To allow for urgent track replacement work on Via dei Castani, between Via delle Acacie and Via degli Ulivi, from Monday 3 March and until no longer necessary, the tram service will be suspended and the following replacement services will be activated:

Single service with tram called 514 between Termini station/Palmiro Togliatti section.
Limitation of line 19 on the “largo Preneste-Valle Giulia” section called 19L.
Bus service (Piazza dei Gerani/largo Preneste) called 519

Tram line 19
Line 19, departing from Valle Giulia, will limit their runs to Largo Preneste, where the return runs will begin.

Tram lines 5 and 14
A single tram service called 514 will be activated from Viale Palmiro Togliatti to Termini station (and vice versa) on the normal route of line 14.

10 თებერვალი 2025 წელი

Tram lines 5, 14 and 19 are reactivated. Line 19 temporary terminus in Valle Giulia.

2 დეკემბერი 2024 წელი

The tram in back in service on line 2, 3 and 8.

5 აგვისტო 2024 წელი

For track work:
Line 2: tram
Line 3: bus service
Line 8: bus service
Line 14: tram
Line 19: bus service

From 5th until 25 August.

26 თებერვალი 2024 წელი

For track work:
Line 2: bus service
Line 3: bus service Porta Maggiore -> Valle Giulia. Tram service Porta Maggiore -> Trastevere
Line 19: bus service Porta Maggiore -> Risorgimento

8 დეკემბერი 2023 წელი

Ending of night work on the Ottaviano — Anagnina section of line A. The old operating mode of the line is restored:
from 5:30 a.m. to 11:30 p.m. Sunday through Thursday and from 5:30 a.m. to 1:30 a.m. Friday and Saturday.

30 ოქტომბერი 2023 წელი

The sections between via Bresadola and Viale Palmiro Togliatti are closed for tram tracks renovation work.
As a result, tram line 14 will be redirected to Piazza Gerani. The closed section is being replaced by buses.

1 ოქტომბერი 2023 წელი

Line 8: the tram service is restored.

23 ივნისი 2023 წელი

Start of work on the site of the future Venezia metro station on line C.

4 ივლისი 2022 წელი

For heavy track work:
Line 3 replaced by buses between Porta Maggiore and Trastevere;
Line 8 replaced by buses.

4 ივლისი 2022 წელი

Start of night work on the entire section of the first stage of line A (Ottaviano — Anagnina) to replace the old railway track and strengthen the underground sections of the line.
From Sunday to Thursday from 21:00 the line is completely replaced by buses along its entire length (Battistini — Anagnina).
From Friday to Saturday the line operates normally until 01:30.

29 ივლისი 2020 წელი

From July 31 to August 4, tram number 3 will be interrupted and will be replaced by buses due to renovations in Piazza Porta Maggiore.

20 ივლისი 2020 წელი

Between August 8 and 23, the section between EUR Magliana and Laurentina stations on metro line B will be closed due to repair work to restore the track ramp near EUR Fermi station.

10 ივლისი 2020 წელი

С 13 июля по 7 декабря с 20:30 линия С будет закрыта для работ по завершению участка San Giovanni — Fori Imperiali.

6 ივლისი 2020 წელი

С 6 по 24 Июля, начинаются работы на Viale delle Milizie. 19-я линия трамвая будет полностью заменена автобусом-челноком на всей протяженности линии.

23 ივნისი 2020 წელი

From 17:50 Baldo degli Ubaldi station on line A will be closed due to a temporary lack of staff.

8 ივნისი 2020 წელი

Подтверждено выделение финансов (213 млн. евро) для линии Roma-Giardinetti (Centocelle):
возвращение в эксплуатацию участок Centocelle-Giardinetti, модернизацию всей линии и её продление от станции Giardinetti до району Tor Vergata.

29 თებერვალი 2020 წელი

From March 2 to August 6 at 21:00 the section of Castro Pretorio — Laurentina line B will be closed for repairs.

14 აგვისტო 2019 წელი

Closing of line A section between San Giovanni-Ottaviano stations for repair work.

4 აგვისტო 2019 წელი

The section of line A between Termini-Anagnina stations is closed for repair work.

8 ივლისი 2019 წელი

The opening of a new trolleybus line 74 in the Laurentino area between Laurentina (MB) and Via Brunetti.

26 ივნისი 2019 წელი

Возвращена в эксплуатацию станция "Repubblica" линии А. (На итальянском: https://www.google.com/amp/s/amp-video.r...121/338724)

13 მაისი 2019 წელი

The electric bus Line 119 is back in service. The electric minibus service in the historic city center was suspended in 2015 due to lack of money and poor condition of the car batteries.

7 მაისი 2019 წელი

Была возвращена в эксплуатацию станция "Spagna" линии А. (Ссылка на итальянском: https://www.ilmessaggero.it/roma/news/me...75929.html).

23 მარტი 2019 წელი

Station "Spagna" closed due to breakage escalator
(https://www.google.com/amp/s/roma.repubb...34401/amp/)

21 მარტი 2019 წელი

The station "Barberini" is closed due to the breakdown of the escalator (https://www.quotidiano.net/cronaca/metro...4501681).