![]() |
Cronologie / Știri: LuoyangÎntoarce-te la pagina orașului Adaugă o înregistrare · Caută în Cronologie / Știri 15 februarie 2025 anLuoyang trolleybus route 102 stops running from February 15.
Noiembrie 2023 anTrolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.
Iunie 2023 anTrolleybus contact network east of Qilihe for route 103 is dismantled.
26 decembrie 2021 anMetro line 2 opens between Erqiao Road and Balitang stations.
Septembrie 1984 anLuoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.
Iunie 1983 anConstruction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).
|
Pagina de start Forumuri Regulament Echipa editorială Temă întunecoasă © Administrația Transphoto și autorii fotografiilor, 2002—2025
Utilizarea fotografiilor sau a altor materiale de pe acest site fără acordul autorilor este interzisă. |