15 veebruar 2025 a.

Luoyang trolleybus route 102 stops running from February 15.

November 2023 a.

Trolleybuses no longer use contact network outside of the depot, traveling the full length of routes 101, 102 on battery power.

Juuni 2023 a.

Trolleybus contact network east of Qilihe for route 103 is dismantled.

26 detsember 2021 a.

Metro line 2 opens between Erqiao Road and Balitang stations.

September 1984 a.

Luoyang trolleybus stage 1 commences operation, with a total overhead wire length of 15.65㎞, 3 transformers, 4 turning loops and 1 depot. The route is operated by 40 thyorister controlled articulated trolleybuses.

Juuni 1983 a.

Construction of Luoyang trolleybus stage 1 commences, undertaken by Henan Third Construction corps (depot), State Grid (wiring), PLA Unit 80590 (poles), Beijing Trolleybus Subdivision (overhead wires and transformers).