TransphotoElektrični gradski prijevoz
Sjeverna Koreja  
South Hamgyong Province

Sinhung

신흥로동자구 新興勞動者區 Sinhŭng-rodongjagu

Urednici: D.Möschke, jiachen.

Report a mistake on this page  ·  Promjene u bazi

Komentari: sve · trolejbus

Kronologija

2024 Approximately 5-6 years after the old Sinhungho trolleybuses were withdrawn and service suspended, the Sinhung commuting trolleybus line resumes service with a new Chollima-321 or Sinhungho (2019) type trolleybus.
2017 The system is most likely mothballed since 2017.
Svi unosi

Brza pretraga vozla

Broj:

Photos By Route

Route:

Trolleybus Facilities / Operators

Sinhung Machine Plant Commuting Trolleybus
The Depot is located about 500 m. short of the eastern terminal. At least 3 trolleybuses were visible at the Depot until 2017. Two trolleybuses didn't operate at least since 10.2013, however, the 3rd trolleybus may had operated until 2017.
Popis modela
Vozila bez slika


Informacije

A 4,1 km-long bidirectional single overhead trolleybus line. A passing point may exist at mid-point, and was installed between about 2013-2017.

Однопутная двусторонняя троллейбусная линия длиной 4,1 км. В середине линии вероятно расположен разъезд, встроенный приблизительно между 2013-2017 гг.

Trolleybus route — Трасса линии:
https://www.google.com/maps/d/viewer?mid...68&z=15

   

Nasumična slika

1


Nove slike

1