TransphotoSähköinen kaupunkiliikenne
Romania  
Arad

Arad

Kalustotietokannan ylläpitäjä: Andrei Andraș.

Ilmoita tällä sivulla olevasta virheestä  ·  Tietokannan muutokset

Kommentit: kaikki · raitiotie · sähköbussi

Uutiset aikajärjestyksessä

02.06.2025 Tram traffic to Ghioroc village will be suspended indefinitely until the infrastructure will be modernized. Therefore, routes 9, 10, 11, 12 and 14 will be suspended and replaced by buses starting from Piața Podgoria.

Also, tram lines 7 and 18b to Micălaca district will be suspended, with trams running via Piața Romană — Confecții — Piața UTA (line 7) and via Piața UTA — Confecții — Piața Romană (line 18b). From Piața Podgoria to Micălaca trams will be replaced by buses.

Also, the modernization of the tram infrastructure from Făt Frumos terminus is completed, therefore the traffic of trams 1b, 3, 6, 15 returns to normal.
26.09.2024 Publication of tender for purchase of 5 electric buses (6m) through the National Recovery and Resilience Plan.
19.12.2024: contract was signed with Anadolu Automobil Rom (romanian importator for Karsan Otomotiv).
23.09.2024 Due to the beginning of the infrastructure modernization from Făt Frumos terminus, tram traffic will be suspended between Piața UTA — Făt Frumos — Piața Gai.

Trams of lines 3, 9, 11, 15, as well as those of lines 7 and 18b will have Piața UTA as their terminus. Tram traffic on lines 1b and 6 will be completely suspended.

To avoid confusion, the shortened route numbers will be followed by the letter "a" (not shown always on the tram signs).
24.09.2023 Ineu: Publication of tender for purchase of 2 electric buses (9m) and one electric minibus through the National Recovery and Resilience Plan.
09.01.2024: minibus contract was signed with DMV Aviatech.
17.01.2024: electric buses contract was signed with Anadolu Automobil Rom (romanian importator for TEMSA Bus & Coach.
12.02.2025: all electric buses were delivered.
06.03.2025: electric minibus was delivered.
24.09.2020 Publication of tender for purchase of 10 electric buses (5x9m + 5x12m) through the Regional Operational Program, Priority Axis 4 of the REGIO Program 2014-2020.
02.06.2021: contract was signed with Anadolu Automobil ROM (romanian importator for TEMSA Bus & Coach).
2022: all electric buses were delivered.
Kaikki uutiset

Kulkuneuvojen pikahaku

Kylkinumero:

Kuvia linjakohtaisesti

Linjalla:

Raitioteiden liikennöitsijät




Sähköbussiliikennöitsijät



Uudet kuvat

» Raitiotie — 33, 74, 77, 0108, 0122, 903, 1100, 1129, 1857, 1860.
» Raitiotie — 1401, 1864, 2009, 2112, 2113, 2327, 2328, 2432, 2433, 2434.
Kaikki päivitykset

Tietoa



Tämän kaupungin aktiiviset kuvaajat

Ensimmäisellä sijalla: Karel Šimána — 275 kuvaa
Toisella sijalla: M. N. — 249 kuvaa
Kolmannella sijalla: Frazzer — 119 kuvaa

Luettelo kaikista kuvaajista

   

Satunnainen kuva



Uudet kuvat