Tram lines and infrastructure
 |
Ksaverska cesta
Reconstruction of the section between Mihaljevac and Matije Jandrića street
19 六月 2025 年 作者: Transspotter
|
 |
Ksaverska cesta
The process of track removal: first they remove stones and leave a hole. Then they cut the rails on a certain point and remove it. The length is always the same, so they fit on a truck that will transport them later.
19 六月 2025 年 作者: Transspotter
|
 |
Ksaverska cesta
At the moment of capturing the rails were still there, however now they have been removed and a hole was dug for concrete base.
19 六月 2025 年 作者: Transspotter
|
 |
Ksaverska cesta
Reconstruction of the section between Mihaljevac and Matije Jandrića street
19 六月 2025 年 作者: Transspotter
|
 |
Ksaverska cesta
Soon the trams will be operating to Mihaljevac and Dolje again, this is how their tracks look like after 6 months of inactivity.
5 十二月 2024 年 作者: Transspotter
|
 |
Ksaverska cesta
Soon the trams will be operating to Mihaljevac and Dolje again, this is how their tracks look like after 6 months of inactivity.
5 十二月 2024 年 作者: Transspotter
|
 |
Ksaverska cesta
Soon the trams will be operating to Mihaljevac and Dolje again, this is how their tracks look like after 6 months of inactivity.
5 十二月 2024 年 作者: Transspotter
|
 |
Gračani
On the tracks of former line 15, there is no traffic since end of May this year. Due to building works on Mihaljevac loop, tram traffic was stopped, so I went to check how the infrastructure looks like. The part between Dolje and Gracanski Mihaljevac is in a really good condition.
3 十二月 2024 年 作者: Transspotter
|
 |
Gračani
On the tracks of former line 15, there is no traffic since end of May this year. Due to building works on Mihaljevac loop, tram traffic was stopped, so I went to check how the infrastructure looks like. The part between Dolje and Gracanski Mihaljevac is in a really good condition.
3 十二月 2024 年 作者: Transspotter
|
 |
Gračani
On the tracks of former line 15, there is no traffic since end of May this year. Due to building works on Mihaljevac loop, tram traffic was stopped, so I went to check how the infrastructure looks like. The part between Dolje and Gracanski Mihaljevac is in a really good condition.
3 十二月 2024 年 作者: Transspotter
|
 |
Okretište Gračansko Dolje Gračani
On the tracks of former line 15, there is no traffic since end of May this year. Due to building works on Mihaljevac loop, tram traffic was stopped, so I went to check how the infrastructure looks like. The part between Dolje and Gracanski Mihaljevac is in a really good condition.
3 十二月 2024 年 作者: Transspotter
|
 |
Okretište Gračansko Dolje
On the tracks of former line 15, there is no traffic since end of May this year. Due to building works on Mihaljevac loop, tram traffic was stopped, so I went to check how the infrastructure looks like. The part between Dolje and Gracanski Mihaljevac is in a really good condition.
3 十二月 2024 年 作者: Transspotter
|
 |
Okretište Gračansko Dolje
On the tracks of former line 15, there is no traffic since end of May this year. Due to building works on Mihaljevac loop, tram traffic was stopped, so I went to check how the infrastructure looks like.
3 十二月 2024 年 作者: Transspotter
|