TransFotoTransporte eléctrico urbano

Metro — [4] Circle Line (CCL)

Singapore

669 KB
147

Dakota Station

30 de julio del a. 2023 yr.
Autor: MirZz

3658 KB
88

Bishan Station

22 de abril del a. 2023 yr.
Autor: Ymtram

4043 KB
132

Singapore,  Alstom Metropolis C830  n.º 8083

Interior, view toward back

An interior of an automated train of the Circle Line.

22 de abril del a. 2023 yr.
Autor: Ymtram

4065 KB
113

Singapore,  Alstom Metropolis C830  n.º 8083

Interior, view toward front

An automated train of the Circle Line.

22 de abril del a. 2023 yr.
Autor: Ymtram

4522 KB
144

Paya Lebar Station (CCL)

The Paya Lebar transfer station, the Line 8-9-10 (CCL).

21 de abril del a. 2023 yr.
Autor: Ymtram

3784 KB
150

Serangoon Station (CCL)

The Serangoon transfer station, the Line 8-9-10 (CCL).

21 de abril del a. 2023 yr.
Autor: Ymtram

3322 KB
126

Metro — [3] North East Line (NEL)

Serangoon Station (CCL-NEL)

The Serangoon transfer station corridor between the Line 8-9-10 (CCL) and the Line 6-7 (NEL).

21 de abril del a. 2023 yr.
Autor: Ymtram

471 KB
358

Marymount Station

4 de enero del a. 2020 yr.
Autor: arch.nk


Pictures displayed: 8 out of 8
Photos currently sorted by date (New photos listed first).

To the list of systems