TransphotoUrban Electric Transit
Canada  
Ontario

Waterloo - Kitchener

Report a mistake on this page  ·  Changes in the Database

Comments: all · tramway

Chronology

21.06.2019 Opening of the first segment of the light rail system — ION. The length of the line between the terminal stations of Conestoga and Fairview is 19 km. There are 19 stations along the line.

Interactive network map: http://carto.metro.free.fr/cartes/tram-kitchener-waterloo/
All Entries

Quick Vehicle Search

Number:

Photos By Route

Route:

Tramway Facilities / Operators



New Photos

» Tramway Lines and Infrastructure
» Tramway — 501, 502, 504, 506, 507, 508, 509, 511, 512.
» Tramway Lines and Infrastructure
» Tramway — 502, 503, 506, 507, 508, 509, 511, 512.
» Tramway Lines and Infrastructure
» Tramway — 502, 503, 507, 508, 511, 512.
All updates


Active Photographers of the City

1st place: Ymtram — 43 photos
2nd place: Malaheenee — 32 photos
3rd place: Angler — 18 photos

Full list of photographers

   

Random Photo



New Photos